ML19308B026
| ML19308B026 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/11/1973 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Seiss C Advisory Committee on Reactor Safeguards |
| References | |
| NUDOCS 7912120784 | |
| Download: ML19308B026 (1) | |
Text
'
Docket Nos. 50-269 JAN 11 1973 50-270 and 50-287 Dr. Chester P. Siess Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energy Commission Washington, D. C.
20545
Dear Dr. Siess:
Sixteen (16) copies of the following are transmitted for review by the Committee:
DUKE POWER COMPANY (Oconce Nuclear Station, Units 1, 2, and 3).
Letter dated December 29, 1972 from Duke Power company transmitting their analysis regarding the consequences of main steam and feedwater piping ruptures at the Oconee Nuclear Station, Units 1, 2, and 3.
Also enclosed for the information of the Conraittee are sixteen copies of a sumary of a neeting between Duke Power Comnany and Babcock & Wilcox held January 4,1973.
9 DISTRIUBTION W
R ing M
[
e 0
ape t er Richard C. DeYoung, sist irector for Pressurized Water Reactors Directorate of Licensing
Enclosures:
As stated PWR-4.
mics,
t IAPelt
- emp l
sumur >
7
~ g.*N.. 7ta 1/11/73._.
c-- --
p
..,..