ML19308B013
ML19308B013 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 12/20/1973 |
From: | Thies A DUKE POWER CO. |
To: | Giambusso A US ATOMIC ENERGY COMMISSION (AEC) |
Shared Package | |
ML19308B014 | List: |
References | |
NUDOCS 7912120770 | |
Download: ML19308B013 (2) | |
Similar Documents at Oconee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML15113A7511999-09-23023 September 1999
[Table view]Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML15261A2481999-04-0202 April 1999 Provides Summary of 990324 Meeting with DPC at Oconee Nuclear Station Re Activities of NRC Management Oversight Group & Licensee Update to Oconee Recovery Plan.List of Meeting Attendees,Dpc Presentation Handout & Checklist Encl ML15261A3991999-03-26026 March 1999 Forwards Insp Repts 50-269/99-01,50-270/99-01 & 50-287/99-01 on 990117-0227.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML15113A6061999-03-17017 March 1999 Discusses GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Hrps, for Plant,Units 1, 2 & 3.Determined That Duke Has Provided Info Requested by GL 97-04.Staff Considers GL Closed for Units ML15261A2261999-03-0101 March 1999 Confirms Telephone Conversation on 990201 Re Two Mgt Meetings to Be Conducted on 990324 at Oconee Nuclear Station.Purpose of Meetings Will Be to Discuss NRC Mgt Oversight Group Issues & Oconee Performance Improvement ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML15112A3991999-02-16016 February 1999 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves ML15261A3951999-02-12012 February 1999 Forwards Insp Repts 50-269/98-11,50-270/98-11 & 50-287/98-11 on 981129-990116 & Notice of Violation ML20206S5951999-02-0303 February 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Their Entirety ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML15112A3861999-01-15015 January 1999 Requests Clarification for 981119 RAI Re Review of License Renewal Application ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML15112A3701999-01-0505 January 1999 Forwards Staff Assessment of Hpis Mu Line Weld Crack & Related B&Wog Response ML15112A3671998-12-29029 December 1998 Forwards RAI for Review of Plant Environ Rept Associated with Util Application for License Renewal Submitted by .Areas Related to Severe Accident Mitigation Alternatives Where Addl Info Needed IR 05000269/19983011998-12-24024 December 1998 Forwards Exam Repts 50-269/98-301,50-270/98-301 & 50-287/98-301 Administered on 981130-1203.All Candidates Passed Examination,Representing 100% Pass Rate.Simulation Facility Rept Included ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 ML15217A1961998-12-0707 December 1998 Ack Receipt of Related to Scoping Process for Relicensing of Oconee Nuclear Station,Units 1,2 & 3 & Clarifies Issue of Concern Re Extent of Relicensing Process ML15112A3451998-12-0404 December 1998 Forwards RAI Re Plant,Units 1,2 & 3 License Renewal Application.Addl Info Requested in Encl Sections of OLRP-1001 ML15112A3441998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station Units 1,2 & 3.Request Re OLRP-1001,Section 4.11.Response Requested within 30 Days of Receipt of Ltr 05000269/LER-1998-012-01, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date ML15112A3411998-12-0303 December 1998 Forwards Request for Addl Info for Review of License Renewal Application for Oconee Nuclear Station,Units 1,2 & 3.Encl Questions from Matls & Chemical Engineering Branch Re OLRP- 1001 Sections 3.4.7,3.4.8,3.4.9,3.5.2,3.5.3,3.5.5 & 3.5.8 ML15112A7031998-11-25025 November 1998 Forwards Request for Addl Info Re Review of Oconee Nuclear Station,Units 1,2 & 3 License Renewal Application,Dtd 980706,specifically,OLRP Sections 1.5.3,2.6,3.2,3.6 & 5.6. Response Requested within 30 Days of Ltr Receipt ML15112A6991998-11-24024 November 1998 Forwards RAI Re Review of Plant Units 1,2 & 3 License Renewal Application.Schedule for Submittal of Responses Requested to Be Provided within 30 Days of Receipt of Ltr ML15112A6931998-11-20020 November 1998 Forwards RAI Re License Renewal Application.Encl Questions from Reactor Sys Branch Re Section 1.5.2 of OLRP-1001 ML15112A6891998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Plant Sys Branch Re Section 2.5.13 of OLRP-1001 ML15112A6861998-11-20020 November 1998 Forwards RAI for Review of Oconee Nuclear Station,Units 1 & 2 Re License Renewal Application.Encl Questions from Mechanical Enginering Branch Re Sections 3.4.4 & 3.5.5 of OLRP-1001 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20209H6921999-07-15015 July 1999
[Table view]Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 05000269/LER-1998-012-01, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc ML20151S7501998-08-31031 August 1998 Provides Update on Commitment Made by Licensee in Response to NOV & Imposition of Civil Penalty Re Valves in Ldst Instrument Lines That Were Incorrectly Translated Into Station Procedures ML20236V9581998-07-27027 July 1998 Forwards Corrected Pages 3.5-30b of 961211 & 3.16-2 of 970205 TS Bases.Old Amend Numbers Were Left on Pages.Rev Changes Footer on Both Pages to Reflect Bases Changes ML20153D1961998-07-0909 July 1998 Requests NRC Reconsider & Grant Util Request for Exemption from Duplicative License Fee Under 10CFR171.11(d) for Storage of Spent Nuclear Fuel at Oconee Nuclear Station ML15112A6541998-07-0101 July 1998 Forwards OLRP-1002, License Renewal Flow Diagrams,Oconee Nuclear Station Units 1,2 & 3, Vol I.Flow Diagrams Prepared to Aid in NRC Staff Review of Application for Renewal of License,Which Will Be Submitted Shortly.W/Oversize Drawings ML20247G0881998-05-14014 May 1998 Provides Rev 2 to Section 3.3, Instrumentation, in Support of TS-362 Amend Request.Position on Testing of Analog Trip Type Instruments W/Regard to Transition from CTS to ITS, Restated.Summary Description of Its/Bases Changes,Encl 05000269/LER-1998-002-01, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown1998-04-30030 April 1998 Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown ML20217G0351998-03-26026 March 1998 Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence ML20203J9301998-02-26026 February 1998 Submits Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Suppl 1 to Bulletin Attached & Contains Listed Commitments 05000269/LER-1997-003-01, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action1997-11-12012 November 1997 Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action ML20198Q5741997-11-0303 November 1997 Provides Suppl to Initial 971020 Application for Amend to TS Re SG Tubing Surveillance Requirements,In Response to NRC 971030 Request for Addl Info.Proprietary Rev 3 to BAW-2303P, OTSG Repair Roll Qualification Rept Encl.Rept Withheld ML16141B2371997-09-25025 September 1997 Forwards Ncmpa 1 Annual Rept for 1996, Per 10CFR50.71(b) ML20211F7981997-09-25025 September 1997 Submits Response to Violations Noted in Insp Repts 50-269/97-10,50-270/97-10 & 50-287/97-10 & Proposed Imposition of Civil Penalty in Amount of $330,000.Corrective Actions:Ldst Instrument Mods on All Three Units Completed ML20211C8021997-09-18018 September 1997 Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error ML20210T7121997-09-0404 September 1997 Informs That Representatives from Oconee Who Compose LERs Would Like to Meet W/Staff & AEOD at Convenient Place & Time to Facilitate Process.Concerns Addressed in Encl ML20149J4841997-07-21021 July 1997 Forwards Addl Pages to Rev 5 to Duke Power Co Nuclear Security & Contingency Plan. Encl Withheld ML20141F1381997-06-25025 June 1997 Forwards Rev 4 to Nuclear Security Training & Qualification Plan, Per 10CFR50.4 ML20140C9531997-06-0303 June 1997 Requests NRC Approval of Amend to Oconee ISFSI to Obtain Commission Approval of Proposed Rev 6 to Encl Physical Security Plan.W/O Encls ML20148C8621997-05-22022 May 1997 Informs That TR BAW-2241P Will Be Ref in Future Submittals of P/T Limit Curve Revs for B&W Plants as Result of 970519 Telcon Between L Lois & J Taylor ML20141K1981997-05-19019 May 1997 Forwards Rev 6 to Duke Power Co Nuclear Security & Contingency Plan.Encl Withheld,Per 10CFR73.21 ML20138G8981997-04-30030 April 1997 Forwards Rev 5 to DPC Security & Contingency Plan.Encl Withheld ML20138B3421997-04-22022 April 1997 Submits Response to Request for Addl Info Re Proposed Amend to Reactor Bldg Structural Integrity Tech Specs.Info Provided in Attachments 2 & 3 Supersedes Revised Pages & Markup Pages in Attachment 1 & 2,respectively ML20137N0231997-03-26026 March 1997 Forwards Revised TS 3.1.6 Bases Pages Deleting Detection Time of Reactor Bldg Air Particulate Monitor for RCS Leak of 1 Gpm ML20137B4731997-03-12012 March 1997 Forwards Rev 3 to Security Training & Qualification Plan.Rev Withheld,Per 10CFR73.21 ML20134P3831997-02-18018 February 1997 Submits Clarification of Design Basis Requirements at ONS for Permanently Installed Insulation in Response to NRC Bulletin 93-002, Debris Plugging of Emergency Core Cooling Suction Strainers ML20138L2101997-02-14014 February 1997 Forwards Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3 & Revised Monthly Operating Status Repts for Dec 1996 ML20134G5511997-02-0404 February 1997 Requests Exemption to Requirements of 10CFR70.24 Re Criticality Accident Monitoring,Per 10CFR70.14(a) & 70.24(d) ML20133M5971997-01-13013 January 1997 Forwards Revs to Oconee Selected Licensee Commitments Manual ML20138G8411996-12-26026 December 1996 Submits Supplementatl Info Re Emergency Power Engineered Safeguards Functional Test Amend Request ML20132F0911996-12-17017 December 1996 Forwards Response to 961212 & 13 Telcons Re Amend to Licenses for Proposed Changes to Updated Final Safety Analysis Rept Re one-time Emergency Power Engineered Safeguards Functional Test 05000269/LER-1996-008, Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability1996-10-31031 October 1996 Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability ML20134H2231996-10-30030 October 1996 Forwards Revised TS 3.7 Bases,Indicating Info Deleted ML20129B2571996-10-16016 October 1996 Submits Addl Info Re 960220 Application for Amends to Licenses DPR-38,DPR-47 & DPR-55 Concerning Proposed Rev to Chemistry TS Sections 3.1.5,3.1.10 & 4.1,in Response to NRC Telcon Request.Revised TS Pages Encl ML20128H2731996-09-19019 September 1996 Forwards Public Version of Rev 96-06 to Plant Emergency plan.W/961003 Release Memo ML20117D5691996-08-23023 August 1996 Requests Exemption for Ons,Units 1 & 2 & Cns,Units 1 & 2 Iaw/Provisions of 10CFR73.5, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20116F0051996-08-0101 August 1996 Forwards Corrected Page for Proposed Amend to TS Re Removal of Es Signal from Valves LPSW-4 & LPSW-5 ML20117E6031996-06-26026 June 1996 Forwards Public Version of Change 2 to RP/0/B/1000/01, Emergency Classification & Change 4 to RP/0/B/1000/22, Procedures for Site Fire Damage Assessment & Repair ML20112A0581996-05-14014 May 1996 Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment ML20115C4371996-05-13013 May 1996 Responds to NRC Bulletin 96-02, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, ML20117D4931996-04-24024 April 1996 Submits Clarification of Reporting Requirements Under 10CFR50.72(b)(2)(vi) 1999-07-15 Category:UTILITY TO NRC MONTHYEARML16259A2391990-08-22022 August 1990
[Table view]Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20055C9851990-06-25025 June 1990 Forwards Rev 9 to Training & Qualification Plan.Rev Withheld ML16152A9841990-06-19019 June 1990 Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1 ML20044A4491990-06-14014 June 1990 Forwards Public Version of Rev 90-05 to Vol C to EPIP Manual. W/Dh Grimsley 900627 Release Memo ML16152A9821990-06-14014 June 1990 Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo ML20043E2571990-05-31031 May 1990 Forwards Request for Relief 90-01 from Requirements of Section XI of ASME Boiler & Pressure Vessel Code Re Inservice Insp During Second 10-yr Interval ML20043F4761990-05-30030 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML16152A9621990-05-0909 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo ML16152A9531990-05-0202 May 1990 Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld ML20042H0321990-04-30030 April 1990 Forwards Public Version of Rev 90-04 to Vol C to EPIP Manual ML20034A8411990-04-10010 April 1990 Advises That Anticipated Walkdown of Plant,Per Resolution of USI A-46 Will Be Deferred Beyond 881007 Schedule & Reserves Right to Revise Implementation Schedule at Plant to Integrate Potential Future Requirements Into Single Program ML15217A1051990-03-26026 March 1990 Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations ML20033F8771990-03-26026 March 1990 Forwards Rev to First Semiannual Solid Waste Rept 1989, Submitted Per .Rev Reflects Corrections on Number of Shipments & Total Vol of Compacted Dry Active Waste Shipped to Burial Site at Barnwell,Sc ML20012D6941990-03-21021 March 1990 Advises of No Human Engineering Discrepancy Mods of Safety Significance for Overall Operation of Plant,Per 880420 Commitment ML16152A9411990-03-14014 March 1990 Forwards Public Version of Rev 90-01 (Vol a) to Emergency Plan Manual & Revs 90-01 (Vol B) & 90-03 (Vol C) to EPIP Manual.W/Dh Grimsley 900329 Release Memo ML20012B3741990-03-0101 March 1990 Requests Extension to Respond to Generic Ltr 90-01 Re Participation in Regulatory Impact Survey Until 900402.Util in Process of Completing Questionnaires for All Units ML15217A1031990-02-28028 February 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals ML20012B3661990-02-21021 February 1990 Forwards Rev 1 to Cycle 12 Reload Rept,Changing Assumed RCS Flow & Correcting Typo ML20012B4541990-02-21021 February 1990 Forwards Public Version of Vol C to Rev 90-02 to EPIP Manuals ML20012B1691990-02-19019 February 1990 Forwards Public Version of Crisis Mgt Implementing Procedures,Including Rev 34 to CMIP-1,Rev 25 to CMIP-2, Rev 30 to CMIP-4,Rev 34 to CMIP-5,Rev 39 to CMIP-5 & Rev 38 to CMIP-7 ML19354E6711990-01-24024 January 1990 Requests Approval to Use Alloy 690 Plugs as Alternative to Requirements of 10CFR55(a),codes & Stds for Plants Prior to 900226 ML20006C7181990-01-22022 January 1990 Forwards Rev 30 to Security Plan.W/O Encl ML16152A9061990-01-19019 January 1990 Forwards Public Version of Rev 90-01 to Vol C to Oconee Nuclear Station Implementing Procedures Emergency Plan & Rev 89-03 to Vol a to Oconee Nuclear Station Emergency Plan. W/900131 Release Memo ML16152A9091990-01-18018 January 1990 Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo ML20005G7601990-01-0404 January 1990 Forwards Public Version of Rev 33 to Crisis Mgt Plan. Privacy Info Should Be Deleted Prior to Placement in Pdr.W/ D Grimsley 900118 Release Memo ML20005G1181990-01-0404 January 1990 Forwards Response to NRC Recommendations in 890828 Audit Evaluation Rept Re Safety & Performance Improvement Program. Util Fully Committed to Enacting Recommendations from Program Via B&W Owners Group Improvement Program ML20042D3731990-01-0202 January 1990 Forwards Revised Crisis Mgt Implementing Procedures, Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9, Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML19351A5721989-12-0707 December 1989 Withdraws Commitment to Install Cavitating Venturies or Any Other Mod to Relieve Operator Burden in Ensuring That Emergency Feedwater Pumps Protected from Runout in Postulated Accidents W/Low Steam Generator Pressurization ML20011D2411989-11-30030 November 1989 Forwards Revised Crises Mgt Implementing Procedures, Including Rev 23 to CMIP-2 & Rev 3 to CMIP-15 ML16152A8751989-11-21021 November 1989 Forwards Proprietary DPC-NE-2003P-A & Nonproprietary DPC-NE-2003-A, Core Thermal-Hydraulic Methodology Using VIPRE-01. Proprietary Rept Withheld ML19332C6571989-11-20020 November 1989 Advises That Listed Addl Protective Measures Will Be Provided for Auxiliary Svc Water Piping,Per ML16152A8731989-11-0101 November 1989 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8 & Rev 31 to CMIP-9.W/891020 Release Memo ML16152A8701989-10-30030 October 1989 Forwards Public Version of Rev 32 to Crisis Mgt Plan for Nuclear Stations. W/891113 Release Memo ML16152A8641989-10-18018 October 1989 Forwards Public Version of Revs 89-05 & 89-07 to Vol B & C, Respectively,Of Implementing Procedures Emergency Plan. W/891030 Release Memo ML19325D9811989-10-16016 October 1989 Forwards Update to Oct 1989, ISFSI Sar ML19351A2771989-10-13013 October 1989 Advises That Tech Spec Amend Request,Including Revised 15 EFPY Pressure/Temp Limits & Revised Low Temp Overpressure Protection Sys Operability Requirements Will Be Submitted by 891115,per Commitment in Re Generic Ltr 88-11 ML19325C9181989-10-0909 October 1989 Forwards Rev 8 to Training & Qualification Plan.Rev Withheld ML20248F1971989-09-29029 September 1989 Clarifies Tech Spec Rev,Consisting of Changes to App J Test Requirements for Valves CA-27,HP-155 & CF-47.All Lines Leading from Auxiliary Bldg to Valves HP-155 & CA-27 Maintained Normally Isolated Through Closed Manual Valves ML20246G9561989-08-23023 August 1989 Submits Details of Method for Reporting Findings Resulting from Design Basis Documentation Program,Per 890728 Meeting. Util Agrees to Submit LER for Each Finding Identified in Design Basis Documentation Program ML20245H4841989-08-0909 August 1989 Forwards Addl Info on DPC-NE-3000, Thermal-Hydraulic Transient Analysis Methodology, Per 890718 & 19 Telcons Re Steam Generator Heat Transfer Modeling W/Retran Code ML20245L6441989-08-0404 August 1989 Documents 890726 Conference Call Re Implementation Schedule for ATWS Mods.Proposed Schedule for Mods to Install ATWS Mitigation Sys Actuation Circuitry Based on Decision to Utilize Programmable Logic Controller ML20248C0091989-07-31031 July 1989 Advises That Response to Generic Ltr 89-06, SPDS, Will Be Delayed Due to Late Date of Receipt of Ltr.Submittal Anticipted by 890808 ML20247H4211989-07-25025 July 1989 Forwards Rev 29 to Security Plan.Rev Withheld ML20247K0211989-07-21021 July 1989 Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Clarifying Info in .Use of Unqualified Components in Vent Paths for Valves Acceptable Based on Secondary Side Cooling ML20246G1711989-07-20020 July 1989 Submits Route Info for Shipment of Eight Irradiated Fuel Rods from Oconee to B&W Lynchburg Research Ctr in Sept 1989, Consisting of Single Shipment w/NLI-1/2 Spent Fuel Shipping Cask.Approval Requested by 890901 ML20246P5721989-07-13013 July 1989 Forwards Request for Relief 89-06 from Requirement of Section of XI of ASME Boiler & Pressure Code Re Second 10-yr Interval Inservice Insp.W/Three Oversize Drawings ML20247A8991989-07-13013 July 1989 Forwards Rev 4 to Process Control Program 1990-08-22 |
Text
.-
AECDIST['UTIONFORPART50DOCKETMATER
10008 (TaiPORARY FORM)
, CONTROL EO FILE:
D W Yower Company I
- Chnrlotte, N.C. 28201 Mr. A.C. Thies 12-20-73 12-27-73 X
TO:
SENT LOCAL PDR m
A. Gistbusso 1 signed CLASS niCLASS PROP INFO INPUT NO CYS REC'D DOCITT NO:
XXX 1 269 DESCRIPTION:
ENCLOSUPIS:
Ltr reporting an abnormal occurrence at the ABNORMAL OCCURRENCE REPORT NO. AO-269/73-9
. Oconts Unit #1......trans the following....
Momentary Inoperability of Reactor Bldg.
Spray System.
p
__j c--
j _ :...
(1 cy enel rec'd)
PLANT NAME: Oconee #1
((]
, } ]~,]
FOR ACTION /INFORMATION 1-2-74 JB BUTLER (L)
SCIMENCER(L)
ZIDiANN(L)
REGAN(E)
W/ Copies W// Copies W/ Copies W/ Copies 8-CLAEK(L)
STOLZ(L)
DICKER (E)
W/ Copics W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
KNIGHTON(E)
)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHDEL(L)
YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies
,)
INTERNAL DISTRIBUTION (REG FlLF TECH REVItM DENTON A/T IND LIC ASST VAOC PDR
- 1ENDRIE GRIMES BRAIDiAN
/0GC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)
SALT 2 MAN
- .4fUNTZING/ STAFF
/MACCARY KASTHER GEARIN (L)
B. HURT
/ CASE
/ KNIGHT BALLARD
/GOULBOURNE (L)
PLANS GIAMBUSSO
/PAWLICKI SPANGLER LEE (T)
MCDONALD BOYD
/SHAO MAIGRET (L)
DUBE w/ Input MOORE (L)(Eb'R)
/STELLO ENVIRO SERVICE (L)
' /DEYOUNG(L)(I%'R)
/ HOUSTON MULLER STEPPARD (E)
INFO SKOVHOLT (L)
/NOVAK DICKER SMITH (L)
C. MILES P. COLLINS
/ROSS KNIGHTON TEETS (L)
- B. KING
/IPPOLITO YOUNGBLOOD WADE (E)
/ REG OPR
/TEDESCO REGAN WILLIAMS (E)
FILE & REGION (3)
/LONG PROJECT LDR WILSON (L)
/ MORRIS
/LAINAS DURHAM (E) g I207/g
,p
- VtTEELE
/BENAROYA HARLESS
/VOLU4ER
/,_
EXTERNAL DISTRIBUTION ML
/1 - LOCAL PDR walna11a, s.U.
/1 - DTIE(AB2RNATHY)
(1)(2)(10) NATIONAL LAB'S 1-PDR-SAN /LA/NY
/1 - NSIC(BUCHANAN) 1-ASLBP(E/W Bldg,Rm 529) 1-GERALD LELLOUCHE 1 - ASLB(YORE /SAYRE/
l-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST.
1-CONSULTANT' S 1-AGMED(Ruth Gussman) d6 - CYS ACRS 6 Sent to Goulbourne NEWMARK/BLUME/AGBABIAN EM-B-127, C.
1-2-74 1-GERALD ULRIKSON...ORUL l-RD.. MULLER..F-309 GT s..
,~
N
'e L
DuxE PowEn COMPANY Powna Burr.orwo 4aa SouTu Cnunen STarzt, CnARIDTTE, N. C. 28201 A. C. Tru es sc..oa wec P.rsios.,
P. o. Box 2178 om
. s......
9 I'Qy December 20, 1973 s
Rfl01[g?.
t ore,7 Mr. Angelo Giambusso tr. g.,,, b7.I A.1
~
Deputy Director for Reactor Projects i.g jwD pf
^g Directorate of Licensing
'j'. L,,.'
g/
,4)<,'
Office of Regulation U. S. Atomic Energy Commission Washington, D. C.
20545 Re: Oconee Nuclear Station Unit 1 Docket No. 50-269
Dear Mr. Giambusso:
Pursuant to Sections 6.2 and 6.6.2 of the Oconee Nuclear Station Technical Specifications issued with Operating License DPR-38, please find attached Abnormal Occurrence Report A0-269/73-9, " Momentary Inoperability of Reactor Building Spray System."
Ve truly yours g
/
a.alb-
- Eos, yA.C.Thies cd NY u
=t J M
, 4lr,,
g Qfg, f.-
h ACT:vr Attachment 6;
N.,'/,
/p/
6 cc:
Mr. Norman C. Moseley
/ / ;r,3 1000i:
_