ML19308A945
| ML19308A945 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/20/1973 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Mangelsdorf H Advisory Committee on Reactor Safeguards |
| References | |
| NUDOCS 7912120718 | |
| Download: ML19308A945 (1) | |
Text
/
Ybl
't DISTRI WIION
% kets (3)
P11R-4 PJg Elcottibourne (2)
IAEltiar AUG 2 01973 ASchwencer RCDeToung Doch t ros.
26 50-270 and 50-287 Mr. Eerold C. Mangelsdorf Chairman, Advisory camefttee on Remetor Safeguards i U, S. Atoatic Energy Cef maion Washington, D. C.
20545 i
j Dear Mr. Mangelsdorf One copy of the following document is trans:xitted for reviaw by the
\\
Cocnittee
\\
\\
nors Pour 2 COMPA'iT
\\N (Oconee Nuclear Station Units 1, 2 and 3)
Letter dated August 3,1973, from Duka Power Company transmitting the Oconne Nuclear Station Interim Security Plan for Oconea Nuclear Station, Units 1, 2 and 3.
Please note that this inferr.stion is PROPRIETARY and is balng vittheld fica public disclosure pursuant to the provisions of Section 2.790 of the Carnufasion's regulations. Upon completion of the Cocanittee's review of this usterial, it should be returnet to Eagubitory 9
Central Files (016-EETB). The material should spt, he reproduced as any time.
I'
,r Sincerely.
1 1
i R. C. DeYoung Assistant Director l
for Pressurized Water Reactois It Directorate of Licensing N
Y.
\\
En:1osurer M
oconee Nuclear Statica Interim Security
(
Plan, Copy #010 omer >
N l
PWR-4 L PM/PWR-4 L C/PWR-4 L AD/PWRs
'\\1 k
sumur >
- h8
)
IAPeltier J.Schwencei RCDeToung
~
i om>
_ =_
l m AIC-SIS (Rev.9-5$[tCM 0240 /J) g[
/5 sftowieu-t/J3ng/
/73 1912120~J/8 D
.