ML19308A938

From kanterella
Jump to navigation Jump to search
Forwards Util Re Flow Restrictor Installation & Util Transmitting Rept Unit 1 Reactor Bldg Post- Tensioning Sys Initial Surveillance. W/O Encls
ML19308A938
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/30/1973
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: Seiss C
Advisory Committee on Reactor Safeguards
References
NUDOCS 7912120711
Download: ML19308A938 (1)


Text

DISTRIBUTION Dockets (3)

PWR-4 Reading Docket Nos. G h EIGoulbourne (2)

IAPeltier 50-270 JAN 3 0 1973 and 50-287 Dr. Chester P. Siess Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energy Commission Washington, D. C.

20545

Dear Dr. Siess:

Sixteen (16) copies of ti.t following are transmitted for

! review bY the Committee:

DUKE P0' DER COMPANY (Oconee Nuclear Station. Unitis 1, 2, and 3)

Letter dated January 12, 1973 from Duke Power Company regarding the installation of flow restrictors in core flooding nozzles entering the reactor vessel at Oconee Units 1, 2, and 3.

Also enclosed for the infomation of the Comittee is a letter dated January 15, 1973 transmitting a report entitled " Unit 1 Reactor Building Post-Tensioning System Initial Surveillance."

Sincerely, M4 Richard C. DeYoung, sistanr Director for Pressurized Water Reactors Directorate of Licensing

Enclosures:

As stated 6;'/D omer >

L:RWR

.4.-

..L:EWR-4

_L: 3R-4 EIGodlkourne:c t IA.P_e

[r ash WADCer_.

sumut,

,1/[]/73.

.1/';F/73

.1L$73.._

Fturvu AEC=818 (Rev. 443)

--I us.maswT rummass aria :tu+a>2i.-em e 2 542 7 9121207/l d