ML19308A809
| ML19308A809 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/17/1973 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Seiss C Advisory Committee on Reactor Safeguards |
| References | |
| NUDOCS 7912120577 | |
| Download: ML19308A809 (1) | |
Text
'
Docket Nos. 50-269 JAN 17 B73 50-270 50-287 Dr. Chester P. Siess Chairman, Advisory Comittee on Reactor Safeguards U. S. Atomic Ener;y Comission Washington, D. C.
20545
Dear Dr. Siess:
Sixteen (16) i cop es of the following are transmitted forinformation of the Committee:
DUKE POWER COMPANY (Oconee Nuclear Station, Units 1, 2, and 3) 1.
AEC letter dated January 2,1973 regarding the operability of active valves at Oconee Units 2 and 3; 2.
AEC letter dated January 4, 1973 transmitting AEC's statement of our positions relative to adjacent Oconce units and the Lee Steam i
L Station combustion turbines; and 5
3.
AEC letter dated January 8, 1973 requesting additional information.
DISTRIBUTION Sincerely, Dockets (3)
EI ul ur e (2)
IAPeltier Richard C. DeYoung, sistan Director for Pressurized Water Reacto'rs Directorate of Licensing
Enclosures:
As stated 4
h LJP_WR,4
_L:PWR-4A.
' L g3R-4 omer >
h
- '~ h k
l EIp
,g urne:emp IAPe r
A encer-sumur >
I out.
Il
/73 1/g/73 1/lg/73-
\\
'/
E Mam AFC-m Sn.4
,,_,,,,,u7912120 %