Forwards IE Insp Rept 50-259/80-14 on 800313-14.No Noncompliance Noted
ML19305E629
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/01/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305E630 List:
References
NUDOCS 8005200143
Download: ML19305E629 (2)


See also: IR 05000259/1980014

Text

-

-

- _ _ _ - _ _ - - _ _ _ -

. - - _________.

c/* ,,_%

80 052 0u't3 WG

.

tg

UNITED STATES

,~' ,o q"

8

NUCLEAR REGULATORY COMMISSION

V

o

&

E

REGION 11

,

o

8

101 MARIETTA ST., N.W.. SulTE 3100

ATLANTA, GEORGIA 30303

s

APR

1 1980

In Reply Refer To:

RII:WPA

50-259/80-14

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

1

'

This refers to the inspection conducted by W. P. Ang of this office on March 13-14,

1980 of activities authorized by NRC License No. DPR-33 for the Browns Ferry

)

Nuclear Plant facility, and to the discussion of our findings held with J. L.

Harness at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

'

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

i

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

-

_

4

h

.

.

..

1

.

Tennessee Valley Authority

-2-

APR

1 1980

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-259/80-14

cc w/ encl:

H. L. Abercrombie

Plant Superintendent

P. O. Box 2000

Decatur, AL 35602

R. E. Rogers, Project Engineer

400 Chestnut Street Tower II

Chattanooga, IN 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902