ML19305E537
| ML19305E537 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/07/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19305E538 | List: |
| References | |
| NUDOCS 8005200030 | |
| Download: ML19305E537 (2) | |
See also: IR 05000321/1980007
Text
!
.
- . . . . .
.
M
<
,
o,,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
Sdd
4
o
$
$
REGION 11
'#
0
101 MARIETTA ST., N.W., SUITE 3100
g
ATLANTA, GEORGIA 3o303
8005200030
....,
APR
7 1980
In Reply Refer To:
RII:RMC
50-321/80-7
I
50-366/80-7
)
-
Georgia Power Con.pany
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. M. Compton of this office on
March 11-14, 1980 of activities authorized by NRC Operating License No. DPR-57
and NPF-5 for the Hatch facility, and to the discussion of our findings held
with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncomplinace were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document koom. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
'
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
-
-
.
_
_ _ .-
.
Georgia Power Company
-2-
APR
7 1500
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
7
C. E. Murphy, Chief
Reactor Co'nstruction and Engineering
Support Branch
,
I
Enclosure:
Inspection Report Nos. 50-321/80-7
and 50-366/80-7
cc w/ encl
'
'
M. Manry, Plant Manager
P. O. Box 442
'
Baxley, GA 31513
C. E. Belflower
i
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
U. A. Widner
Vice President and General Manager
Nuclear Generation