Forwards IE Insp Repts 50-321/80-07 & 50-366/80-07 on 800311-14.No Noncompliance Noted
ML19305E537
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/07/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19305E538 List:
References
NUDOCS 8005200030
Download: ML19305E537 (2)


See also: IR 05000321/1980007

Text

!

.

- . . . . .

.

M

<

,

o,,

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

Sdd

4

o

$

$

REGION 11

'#

0

101 MARIETTA ST., N.W., SUITE 3100

g

ATLANTA, GEORGIA 3o303

8005200030

....,

APR

7 1980

In Reply Refer To:

RII:RMC

50-321/80-7

I

50-366/80-7

)

-

Georgia Power Con.pany

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. M. Compton of this office on

March 11-14, 1980 of activities authorized by NRC Operating License No. DPR-57

and NPF-5 for the Hatch facility, and to the discussion of our findings held

with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncomplinace were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document koom. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

'

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

-

-

.

_

_ _ .-

.

Georgia Power Company

-2-

APR

7 1500

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

7

C. E. Murphy, Chief

Reactor Co'nstruction and Engineering

Support Branch

,

I

Enclosure:

Inspection Report Nos. 50-321/80-7

and 50-366/80-7

cc w/ encl

'

'

M. Manry, Plant Manager

P. O. Box 442

'

Baxley, GA 31513

C. E. Belflower

i

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

U. A. Widner

Vice President and General Manager