UNITED STATES n
NUCLEAR REGULATORY COMMISSION fo' 'o REotoN lV E i 8 _' I 1 0
611 RY AN PLAZA D AlVE, SulTE 1000
,f
"/-
ARLINGTON, ~ fX AS 76012
?g - O
/
April 3, 1980 In Reply Refer To:
RIV Docket No.
STN 50-482/IE Circular No. 80-07 Kansas Gas & Electric Co.
Attn:
Mr. Glenn L. Koester Vice President-Operations Post Office Box 208 Wichita, Kansas 67201 Gentlemen:
The enclosed IE Circular No. 80-07 is forwarded to you for information.
No written response is required.
Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, Y
(& l Karl V. Seyfrit Director
Enclosures:
1.
IE Circular No. 80-07 2.
List of IE Circulars Recently Issued cc: w/ enclosures Messrs. Nicholas A. Petrick, SNUPPS D. T. McPhee, Kansas City Power and Light Company Gerald Charnoff, Shaw, Pittman, Potts & Trowbridge E. W. Creel, Kansas Gas and Electric Company 8 0042 20 QQ
SSINS:
6830 Accession No.:
UNITED STATES 8002280657 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 80-07 Date: April 3, 1980 Page 1 of 3 PROBLEMS WI71 HPCI TURBINE OIL SYSTEM Description of Circumstances:
During 1979, a number of events were experienced at BWRs in which the High Pressure Coolant Injection (HPCI) system failed to perform its function due to HPCI turbine problems. Most of the failures were found during normally required surveillance testing, although others occurred during demand condi-tions. Events which are examples of these occurrences are described below.
The turbines in these events were Terry Steam Turbines.
Failure Due to Water in the HPCI Turbine Oil System:
Georgia Power Company reported on June 4, 1979, that the Hatch Unit 2 HPCI system failed to function upon receiving an initiation signal. The turbine-driven HPCI pump failed to start because the turbine steam stop valve failed to open.
Investigation revealed water in the turbine oil system, which is a combined lubrication and hydraulic' control system.
Hydraulic oil pressure is supplied to the turbine control and the stop valves and also to system bearings by an auxiliary DC powered oil pump during startup and then by the shaft-driven hydraulic oil pump when the turbine reaches operating speed.
The water contamination changed the oil characteristics; as a result, sufficient hydraulic oil pressure was not developed to open the turbine stop valve.
Two sources of water inleakage into the turbine oil system were identified.
One source of leakage was determined to be from a defective mechanical seal on the HPCI pump seal injection line. A second source of inleakage was determined i
to be the oil cooler. Repairs to the cooler tube sheet and mechanical seal were made. Additional corrective action included locking open the bracket cavity drain valve which had not been included on system drawings or procedures, j
and the initiation of routine sampling of the turbine oil system.
Failure of Hydraulic Cylinder Seal in HPCI Turbine Stop Valve:
Nebraska Public Power District reported at the Cooper Station that on August 9, 1979, upon receipt of an auto start signal, the HPCI system did not properly start.
However, a short time (14 minutes) after the initiation signal, the i
HPCI did start and maintained reactor vessel water level.
Investigation showed that the initial failure of the HPCI system to start was due to the i
IE Circular No. 80-07 Date:
April 3, 1980 Page 2 of 3 failure of the HPCI turbine stop valve to open. Further inver,tigation revealed a failure of the seal rings in the hydraulic cylinder actuator of the turbine stop valve. The seal rings were allowing oil leakage to bypass the piston of the operator and insufficient force was available to open the stop valve at full system steam pressure.
The HPCI turbine step valve is a vertically mounted, hydraulically operated, piston type globe valve with the actuating cylinder on the bottom and an internal balance chamber on top of the globe valve piston. The balance chamber functions to provide smooth operation of the valve during its actuation.
This function is provided by an internal orificed steam passage which permits a portion of the incident steam pressure to accumulate in the balance chamber.
During this event the valve actuation did not have sufficient force, due to the leaking seal rings, to overcome the initial steam pressure in the balance chamber. As the main steam pressure decreased to about 600 psig after the rea,ctor scram, the force on the valve actuator piston became sufficient to open the stop valve thereby permitting the HPCI turbine to start and aid in restoring the water level in the reactor.
The failed piston ring seals were fabricated from resin impregnated leather.
The design and failure causes were reviewed by General Electric together with Terry turbine and component suppliers and the review resulted in recommending that the hydraulic cylinder be examined for bypass leakage and replacement of the seals upon determination of excess leakage.
It was also recommended that subsequent seal replacement be placed on a five year schedule.
Recommended action for BWR licensee's and permit holder's considerations:
All holders of operating licenses for BWR power reactor facilities having Terry turbines should be aware of the potential problems described above (it is noted that the seal problem is related to the HPCI turbine and not to the RCIC turbine which does not use a hydraulic actuated stop valve).
It is recommended that the matters identified above be reviewed at your facility in the following respects:
1.
Each BWR licensee should assure that the as-built system is consistent with operating procedures and drawings, and that their preventive maintenance program includes the means of routinely detecting water or other deterioration of the turbine oil ~ systems.
Periodically, the turbine oil should be sampled for moisture immediately following turbine operation. Procedures specifying appropriate corrective actions should be provided as necessary.
2.
Each BWR licensee should initiate an examination of the stop valve hydraulic cylinder seals for excess bypass leakage and proceed with seal replacement on determination of excess leakage followed by the recommended 5 year schedule. Thereafter, periodic re-examinations of the seals are i
to be made to provide assurance that seal replacements are functioning as required.
1 l
l l
i l
IE Circular No. 80-07 Date: April 3, 1980 Page 3 of 3 All holders of construction permits for BWR power reactor facilities should be aware of the potential problems identified above and initiate appropriate procedures prior to initial fuel loading.
This Circular is being forwarded for information to all other power reactor facilities with an operating license or construction permit. No written response to this Circular is required.
If you need additional information regarding these matters, contact the Director of the appropriate NRC Regional Office.
i r
l 1
i
IE Circular No. 80-07 April 3, 1980 RECENTLY ISSUED IE CIRCULALS Circular Subject Date Issued To No.
Issued 80-01 Service Advice for GE 1/17/80 All licensees of nuclear Induction Disc Relays power reactor operating l
facilities and holders of nuclear power reactor Construction Permits (cps) 80-02 Nuclear Power Plant Staff 2/1/80 All holders of Reactor Work Hours Operating Licenses (OLs),
including research and test reactors, and Construction Permits (cps) 80-03 Protection from Toxic Gas 3/6/80 All holders of a power Hazards reactor Operating License (OL) l i
80-04 Securing of Threaded 3/14/80 All holders of a power Locking Devices on Safety-reactor Operating License Related Equipment (OL) or Construction Permit (CP) 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating Oil Addition reactor Operating License (OL) and Onsite Supply or Construction Permit (CP) 80-06 Control and Accountability 4/14/80 Medical licensees in Systems for Implant Categories G and G1 Therapy Sources Enclosure l