ML19305E049
| ML19305E049 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/04/1980 |
| From: | Bryant J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19305E050 | List: |
| References | |
| NUDOCS 8004220215 | |
| Download: ML19305E049 (2) | |
See also: IR 05000321/1980008
Text
- - _ _
,
+p ~m'o
g,
UNITED STATES
\\
8
g
NUCLEAR REGULATORY COMMISSION
M-
,
g
3 m
REGION il
o,
'[
101 MARIETTA ST
N.W., SUITE 3100
- [
ATLANTA, GEORGIA 30303
NAfi
4 1980
In Reply Refer To:
RII:VLB
50-321/80-08
50-366/80-08
Georgia Power Company
'
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
'
This refers to the inspection conducted by V. L. Brownlee of this office on
February 21-22, 1980 of activities authorized by NRC Operating License No.
DPR-57 and License No. NPF-5 for the E. I. Hatch Nuclear Plant facility, and
to the discussion of our findings held with M. Manry at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector. .
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
,
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
,
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
800.4220215
,
4
.
!
Georgia Power Company
-2-
4 1980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
J. C. Brya t, Acting Chief
,
Reactor Construction and
'
Engineering Support Branch
Enclosure:
Inspection Report Nos. 50-321/80-08
and 50-366/80-08
cc w/ encl:
M. Manry, Plant Manager
.
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner
Vice President and General Manager
Nuclear Generation
Georgia Power Company
Post Office Box 4545
Atlanta, GA 30303
s
a
e
4
k
4
O
l
4
t
.
W
e