Forwards IE Repts 50-321/80-08 & 50-366/80-08 on 800221-22. No Noncompliance Noted
ML19305E049
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19305E050 List:
References
NUDOCS 8004220215
Download: ML19305E049 (2)


See also: IR 05000321/1980008

Text

- - _ _

,

+p ~m'o

g,

UNITED STATES

\\

8

g

NUCLEAR REGULATORY COMMISSION

M-

,

g

3 m

REGION il

o,

'[

101 MARIETTA ST

N.W., SUITE 3100

          • [

ATLANTA, GEORGIA 30303

NAfi

4 1980

In Reply Refer To:

RII:VLB

50-321/80-08

50-366/80-08

Georgia Power Company

'

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

'

This refers to the inspection conducted by V. L. Brownlee of this office on

February 21-22, 1980 of activities authorized by NRC Operating License No.

DPR-57 and License No. NPF-5 for the E. I. Hatch Nuclear Plant facility, and

to the discussion of our findings held with M. Manry at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector. .

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

,

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

800.4220215

,

4

.

!

Georgia Power Company

-2-

MAR

4 1980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

J. C. Brya t, Acting Chief

,

Reactor Construction and

'

Engineering Support Branch

Enclosure:

Inspection Report Nos. 50-321/80-08

and 50-366/80-08

cc w/ encl:

M. Manry, Plant Manager

.

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303