Requests Tech Specs to Begin Cycle 4 Operation.Forwards Proposed Tech Specs & NEDO-24235, Supplemental Reload Licensing Submittal for Reload 3, Revision 1
ML19305D957
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/11/1980
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19305D958 List:
References
NO-80-576, NUDOCS 8004170015
Download: ML19305D957 (2)


Text

.

y Carolina Power & Light Company April 11, 1980 FILE: NG-3514(B) SERIAL NO,: NO-80-576 Office of Nuclear Reactor Regulation Attention: Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Commission Washington, D. C. 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 LICENSE NO. DPR-62 DOCKET NO. 50-324 FUEL CYCLE No. 4-RELOAD LICENSING

Dear Mr. Ippolito:

In accordance with the Code of Federal Regulations, Title 10, Part 50.90 and Part 2.101, Carolina Power & Light Company (CP&L) hereby i requests revisions to the Technical Specifications for its Brunswick Steam Electric Plant (BSEP), Unit No. 2.. These revisions are necessary to begin Cycle 4 operation. Changes to the Technical Specifications are indicated by vertical lines in the right-hand margins of the affected pages which are attached. i Forty (40) copies of General Electric's (GE) report NED0-24235, Revision 1, " Supplemental Reload Licensing Submittal for BSEP Unit 2 Reload 3,"

are attached to this letter. This GE report does not include credit for the end-of-cycle Recirculation Pump Trip (EOC-RPT) feature. This non-RPT analysis is used to generate fallback operating MCPR limits to be implemented if the EOC-RPT system becomes inoperable during Cycle 4.

The attached proposed EOC-RPT technical specifications are the result of our review of Standard Technical Specifications which were provided to CP&L informally by your staff. Pages 3/4 2-10 and 3/4 2-10a attached to this letter supersede page 3/4 2-10 which is attached to our February 20, 1980 submittal.

All other tech. spec. pages (i.e., those submitted herewith and those submitted with our February 20, 1980 letter) remain applicable for BSEP-2 Cycle 4.

Brunswick Unit No. 2 is scheduled for start-up on May 10, 1980. Due to scheduled overlapping refueling outages on the two Brunswick units in Spring, 1980, it is extremely important that the staff review of BSEP's outage-related technical iss tes be completed and that the appropriate license amendment (s) be issued in time to allow return to power in accordance with the above schedule.

411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh, N. C. 27602 m _ _ - _ .

soop ,o45,

-2 This request is submitted to be included with the Brunswick Unit No. 2 reload technical issue, and, therefore, no additional license amendment application fee is required.

Should you have any questions concerning this submittal, please contact our staff.

Yours very truly, f.' ,f

e. L _' s E.' E. Utley Executive Vice Preside t Power Supply & Customer Services JAM /tl Attachments Sworn to and subscribed before me this lith day of April 1980 5Mv_  : $4M4&1!)

Notary Public

)444143 My commission expires: Octob9r 4,1981 N

\.