ML19305D782

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-017/01T-0,80-018/01T-0 & 80-019/03L-0
Date released: 11/15/2019 Download: ML19305D782


LER 80-019/03L-0:on 800310,while Steam Flushing,Crack Found in Channel Head of Liquid Waste Evaporator Bottoms Heat Exchanger.Caused by Equipment Failure,Probably Due to Chloride Stress Corrosion.Sleeve Welded Over Channel Head
ML19305D809
Person / Time
Site: Beaver Valley
Issue date: 04/08/1980
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D809 (2)
LER 80-018/01T-0:on 800326,plant Operators Were Testing Temporary Fire Pump When Section of Fire Main Failed.Caused by Piping Failure.Failed Section of Piping Replaced
ML19305D797
Person / Time
Site: Beaver Valley
Issue date: 04/08/1980
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D797 (2)
LER 80-017/01T-0:on 800326,reanalysis of Seismic Pipe Stress of Main Steam Piping Inside Valve House for OBE long-term Criteria Showed,For Some Conditions,Allowable Stress Level May Be Exceeded in Headers for Main Steam Relief Valves
ML19305D794
Person / Time
Site: Beaver Valley
Issue date: 04/08/1980
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D794 (2)
Forwards LERs 80-017/01T-0,80-018/01T-0 & 80-019/03L-0
ML19305D781
Person / Time
Site: Beaver Valley
Issue date: 04/08/1980
From: Werling J
DUQUESNE LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D781 (2)