ML19305D702

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1980
ML19305D702
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/11/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19305D703 List:
References
NUDOCS 8004150426
Download: ML19305D702 (1)


Text

Alabama Power Company 600 North 18th Street Post Offic Box 2641 BirminghJ;m, A1:bam:2 35291 Telephone 205 323-5341 m

F. L. CLAYTON. JR.

Alabama Power Senior Vice President stW Southern eftC!nc system April 11, 1980 Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the March,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please ad -ise.

Yours very(

,r,

's l'

)jk e

e t

F. L. Clayton, Jr.

FLCJr/JRC:bhj Attachments cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) l

~

f t

\\

8004150[-N