AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-285 ,,
UNIT Fort Calhoun #1 DATE April 2, 1980 COMPLETED BY B. J. Hickle TELEPHONE 402-536-4413 MONT11 March, 1920 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0.0 37 0.0 2 0.0 18 0.0 3 0.0 39 0.0 4 0.0 20 0.0 5 0.0 21 0.0 6 0.0 22 0.0 7 ,a 0.0 23 0.0 8 0.0 24 0.0 9 0.0 25 0.0 10 0.0 26 0.0 1 0.0 27 0.0 12 0.0 28 0.0 13 O_0 29 0.0 14 0.0 30 0.0 15 0.0 3 0.0 16 0.0 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77 )
8 004150 M r - _
~
OPERATING DATA REPORT -
DOCKET NO. 50-285 DATE April 2.1980 -
CO3tPLETED BY B. J. Hickle TELEPilONE 402-536-4413 i
OPERATING STATUS Fort Calhoun Station Unit No.1 N 8'5
- 1. Unit Name:
- 2. Reporting Period: March. 1980
- 3. Licensed Thennal Power (31Wt): 1420
- 4. Nameplate Rating (Gross 31We): 502
- 5. Design Electrical Rating (Net SlWe): 457
- 6. Stasimum Dependable Capacity (Gross 31We): 401
- 7. Stasimum Dependable Capacity (Net 31We): 45/
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Leve: To Which Restricted. If Any (Net 31We): .N/A
- 10. Reasons For Restrictions. If Any: N/A This alonth Yr.-to-Dat e Cumulative I1. Ilours In Reporting Period 744.0 2,184.0 57,121.0
- 12. Number Of flours Reactor Was Critica! 0.0 432.9 44.834.5
- 13. Reactor Resene Shutdown !!ours 0.0 0.0 1,309.5 14.11ours Generator On.Line 0.0 430.5 43.881.6
- 15. Unit Rewne Shutdown flours 0.0 0.0 0.0
- 16. Grow T hermal Energy Generated (31Wil) 0.0 574,730.9 53.809.760.2 .
- 17. Gross Electrical Energy Generated (31Wil) 0.0 - _. 190.604.0 17.850.833.6 IS. Net Electrical Energy Generated (31Wil) 0.0 180.935.1 16.868.454.9
- 19. Unit Senice Factor 0.0 19.7 76.8
- 20. Unit Availability Factor 0.0 19.7 76.8
- 21. Unit capacity Factor (Using alDC Net) 0.0 18.1 65.1
- 22. Unit Capacity Factor (Using DER Nat) 0.0 18.1 64.6
- 23. Ucit Forced Outage Rate 0.0 0.0 4.5
- 24. Shutdowns Scheduled Oser Nest 6.\lonths (Type. I) ate,and Duration of Each t: _
None
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: April 15, 1980
- 26. Units in Test Status IPrior to Commercial Operationi: Foreca's: Achiesed IN111A L CRITICA LITY INITIAL ELECTRICITY Coll \lERCIA L OPER A TION (9/77) o
1 UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 s
DATE April 2,1980 COMPLETED sii B. J. Hickle REPORT MONTil Mar.ch,1980 TELEPif0NE ID2-536-4413
% O C No. Date c-
.!E T. E
'h 4Y5 jE$
Licensee ,En, hL Cause & Corrective
$ Event u? o. 3 Action to S j@ $ 3gj=s Report r 80 $U Prevent Recurrence e o C
80-01 800118 5 1753.5 C 1 N/A Reactor shutdown for annual refueling and maintenance outage.
I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparatio'n of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I-Same Source (9/77) li Other (Explain)
Refueling Infonnat'on Fort Calhoun - Unit No.1 .-
Report for the nonth ending March 31, 1980_. .
' l. Scheduled date for next refueling shutdown. - / March 15. 1981 May 15, 1981
- 2. Scheduled date for restart following refueling.
- 3. Will refueling or rcsumption of operation thereafter require a technical specification change or other No license anendaent?
- a. If ans'<.cr is yes, what, in general, will these be?
- b. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Contnittee to deter-mine whether any unreviewed safety questichs NO are associated with the core reload.
- c. If no such review has taken place, when is February 1, 1981 it scheduled?
- 4. Scheduled date(s) for submitting proposed licensing action and support infonration.
- 5. Inportant licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unrevicsud design or perfonnance analysis nuthods, significant changes in fuel design, new operating procedures.
133 assemblics G. The number of fuel assemblics: a) in the core "
b) in the spent fuel pool 197 c) spent fuel pool.
storage capacity 483 d) planned spent fuel pool 483 storage capacity
- 7. The projected date of the last refueling that can be discharged to the spent fuel pool assunting the.present licensed capacity. '1985 Prepared by_ -
dZ/>y4/) Date March 31, 1980 1 <
OMAHA PU3LIC POWER DISTRICT Fort Calhoun Station Unit No. 1 March 1980 Monthly Operations Report b I. OPERATIONS SU'UARY Fort Calhoun re=ained in a refueling configuration during the month of March.
Maintenance of systems is continuing. Several refueling surveillance tests were ec=pleted during March. The plant is being placed in a startup configuration while avaiting completion of the I.E. Bulletin 79-02 and 79-lh work.
The special Nuclear Regulatory Com=ission task force on the i=ple=enta-tion of NUP.EG-0578 short ter reco==endations visited the site in early March. No significant proble=s were uncover ed and efforts are continu-ing to co=plete the changes.
One new e=ployee was added to the Operations Department in the position of au: ciliary operator (nuclear) .
The Supervisor-Operations attended a meeting in Windsor, Connecticut to review the E=ergency Procedure guidelines to be sub=itted to the NRC staff frc= the Combustion Engineering owners group.
Other operations duties were performed as scheduled.
A. FIRFORMANCE CHARACTERISTICS LER Nu=ber Deficiency LER-005 An inadvertent radi-active gas release to the atmosphere occurred due to failure of the rupture disk used to protect the reactor con-tain=ent from overpressurization during the Contain=ent Integrated Leak Rate Tes (ILET).
The release was within Technical Specification Limits.
LER-005, Rev. 1 An inadvertent radioactive gas release to the atmosphere occurred due to failure of the rupture disk used to protect the reactor con-tainment frc= overpressurization during the Contain=ent Integrated Leak Rate Test (IIST).
The release was within Technical Specification Limits.
LER-007, Rev. 1 During the review required by I.E. Bulletin (1979)79-013, the ste= =ounted limit switches on-HCV-86h and ECV-865 (charcoal filter spray supply) were found to not be environmentally qualified. The li=it switches provide pcsition indication ouly and vill not jeopardize valve control or cparability.
. t Monthly Operations Report. ,
C' f 500@(BR$RM q A. PERFOR WICE CEARACTERISTICS (Continued) 4 LER :iu=ber Deficiency ,
i LER-007, Rev. 2 During the review required by I.E. Bulletin !
(1979)79-013, the limit switches on ECV-7h2A/C .
(contain=ent purge syste=) and ECV-72hA and T25A (contiainment filter unit da=pers) were found to not be environ =entally qualified.
The limit switches provide: valve indication only and vill not .jeopardi:fe valve control or operability. ,
LER-007, Rev. 3 During the review required by I.E.79-013 (1979) the Barksdale pressure switch which inter-i locks with a containment isolatica signal to isolate the instrument air header on lov
' header pressure and contain=ent isolation was found to not have environmental qualifications. !
The 7perators have been instructed to manually
'. 1solate the containment instru=ent air header if low pressure is indicated during an accident.
- 3. CHANCES IN OPERATING METHODS i
None ,
C. RESULTS OF SURVEILLANCE TESTS A'ID INSPECTIONS ,
None .i i
k l D. CFANGES, TESTS AND EXPERI'CITS CARRIED CUT WITHOUT CCMMISSION APPROVAL L Procedure Description SP-FE-3 Eddy current testing of Irradiated Fuel Assembly 4
Guide Tubes.
SP-FWRG-2 Radiographic Exa=ination of Feedvater Line-Welds.
E. RESULTS OF LEAK RATE TESTS !
Plant staff continued testing penetrations (Type C tests) during the =cnth of March. No abnormal leak rates vere found during this period. A combined leak rate test results report vill be written at the conclusion of the refueling outage.
F. CHAUGES IN. PLANT OPERATI'IG STAFF >
One new employee was added to the Operations Department in the position of Auxiliary Operator (Nuclear).
l
Monthly Operations Report l
March 1980 h Page Three G. TRAINING u Training during the nonth of March included Radiation Protection for contract personnel working on site, requalification exacinations for the licensed operators and Cycle 6 training for all-operators.
-H. CHANGES, TESTS AND EXPERI C TS REQUIRING NUCLEAR _ REGULATORY COMMISSION AUTHORIZATION PURSUANT TO 10CFR50.59 None I k t
3 Approved by k 1 ) t ( d ager-Fori.Calhoun Station
Monthly Cperations Report March 1980 t age Four u gk
- I. MA!': TINA 3CI (3ignifioant Safety Related)
" . 2. = : ate i :escrintion 1 : rree:17e Act;:n h73h 3-21-80 RPS "A" Channel, indicated TCOLD Replac.ed module E.S. in TM/LP-6T.
fluctuating, input volta 6 s steady. Power calculator, performed ST-RPS-h.
hhT5 2-15-80 "D" TU-8 power supply, "D" 102, Hi Found faulty filter capacitor, pressuriner pressure , power supp17 repaired and set output voltage -
voltage is low.' 52.18 volts.
'I 501 3-28-80 CCW Supply to VA-83,.HCV h03A.will Blev moisture from transmitter not operate from switch in Cont.rol .
supply lines.
Room, to operate, turn air off to valve.
3996 3-25-80 Intermitting ground on BC Matrix Found wire from C to 3 Matrix power supplies. shorting to ground, repaired and insulating vire.
4877 3-19-80 Valve leak on H Purge.
2 Installed new k" rubber seat and asbestos gaskets.
h325 3-8-80 Spent resin. pump, WD-3h, packing Packing replaced, packing gland leaking. installed and double nuttad for j
security.
3506 3-1h-80 T indication fluctuates en Repaired cold solder connection, .
hbSCIP DV'4 when drawer is cleaned pin connections, moved.
h165 3-lh-80 LLSP setpoint drifts on caster Replaced bad relay contacts, and alarm. repaired cold older joint.
h833 3-21-80 Seal leak on "3" spent regent pump. Adjusted packing.
2h76 3-12-80 Inspected all ter=inal blocks and TBSC is a G.E. block (NDWC fan, all ju.ction boxes inside centainment not Safety Related). All others to determine type and if they are are States.
covered with R.T.7.-
i 2597 3-18-80 Vent fitting en flange at RC-100 Flange was r<. moved, existing veld has defective svage lock fitting. metal on enage lock removed and veld socket cleaned. New fittingt velded into flange, LP tests per-
.i formed on veld, flange installed using new gasket.
~L975 3-31-80 Modify restraint SIS-30/SI'I-108. Snubber and hardware restored to operating condition.
I I
Mon bly Operations aeport g b March 1980 QD
?S4e Five su h II. MArrmsc (significan: safety aeia:ed)
X. J.
- I Ca:e i 3escrip:1:n i : rrective A ::::
4369 3-27-80 Modify pipe restraint SIS-123 Work performed, snubber and hardware returned to operating condition.
h173 3-T-80 Modify pipe restraint SIS-167 Work performed, snubber and hard-vare returned to operating condi-tion.
b983 3-30-80 Modify pipe restraint SIS h and Work performed, snubber and hard-SIS hA. vare returned to operating condi-tion.
hTTh 3-25-80 Modify pipe restraint SIS-10hA. Work performed, snubber and hard-vare returned to operating condi-tion.
4173 3-7-80 Modify pipe restraint SIS-167 Work performed, snubber and hard-vare returned to operating condi-tion.
h369 3-27-80 Modify pipe restraint SIS-123 Work perfor ed, snubber and hard-vare returned to operating condi-tion.
h321 3-7-80 Modify pipe restraint SIS-128. Work performed, snubber and hard-vars; returned to ope ; ting condi-tion.
h8h7 3-lh-80 Modify SIS-127A. Work pec'a ced, support returned to operating condition.
hh50 2-19-80 Modify FWS kh. Work performed, support rettrned to operating condition.
% 07 2-22-80 Modify MSS-T. Work perforned, support returned to operating condition.
h395 3-11-80 Modify acH-58. Work performed, hanger returned to operating condition.
hh08 2-16-80 Modify ACS-109 Work performed, support returned to operating condition, bh10 2-19-80 Modify-ACS-118. Work performed, support returned to operating condition.
- ! hh11 2-19-80 Modify Acs-128. Work perfor=ed, support returned to operating condition.
t
Monthly Cperations Repc.9 March 1980 lI. YAr.CMCI (Significan Safety Related)
M. 3.
- Ja:e i Jescri::1:n Corree:1re Action t hh67 2-19-80 Modify ACS-279 Work performed, support returned to operating condition.
hh68 2-22-80 Modify ACS-116. Work performed, support returned to operating condition.
hh69 2-19-80 Modify ACS-133 Work performed, support returned to operating condition.
5029 3-28-80 Modify ACH-3h7 Work performed, hanger returned to operating condition.
h908 3-25-80 Modify FWS-67 Work performed, support returned to operating condition.
h251 3-28-80 Modiff FPS-17 Work performed, support returned to operating condition.
4975 3-31-80 Modify SIS-3 and SIH-108. Work perfor=ed, support returned to operating condition.
hh52 2-17-80 Modif/ MSS-8D. Work performed, support returned to operating condition.
4149 3-7-80 Modiff SIS-152. Work performed, support returned to operating condition.
h050 2-6-80 Modify WS-57 Replaced existing baseplate and anchors.
h0h8 2-6-80 Modify WS-79 Replaced existing kneebrace and anchors.
h622 3-3-80 Modif/ Wi-1103. Work perfor=ed, support returned to operating condition.
h62k 2-22-80 ModiP/ WS-1C. Work performed, support returned to operating condition.
k625 2-29-80 Modify RCS-1. Work performed, suppor returned to operating condition, h6h3 2-28-80 Modify ACS-223 Work perfor:ed, support returne:i to operating condition.
h803 2-29-80 Modiff SIH-177 Work perfo med, ha per returned to operating condition.
L
Monthly Operatices Report March 1980 0 b
?sge Seven g II. MA".nf2'LCICI (3ignificant safety Related)
M. 2. * ,
Cate 1 :escription s :orrective A::::n h67h 2-22-80 Modify SIH-187 Work perfor ed, henger returned to operating condition.
480h 2-2h-80 Modify SIH-197 Work performed, hanger returned to operating condition.
h620 2-22-80 Modify ACS-120/ACH-329 Work perfor ed, hanger and support returned to operating condition.
h621 2-22-80 Modify ACS-122. Work performed, support returned to operating condition.
h623 2-2h-80 Modify SIS-165A. Work performed, support returned to operating condition.
b6h9 2-28-80 Modify SIS-16h. Work perfor=ed, support returned to operating condition.
4081 2-10-80 Modify RWS-8h. Work performed, support returned to operating condition.
hh09 2-19-80 Modify ACS-113 Work performed, support returned to operating condition.
hoh5 2-9-80 Modify WDS-266. Work performed, support returned to operating condition.
3829 2 h-80 Replace baseplate at RWH-11h. Work perfor=ed, hanger returned to operating condition.
3596 2-27-80 Broken support en leak off line Revelded support to former locaticm HCV-2hl.
h260 2-16-80 Modiff ACS-313/and ACH-309 Work performed, hanger and support returned to operating condition.
h289 2-16-80 Relocate ACH-363 Relocated adjacent to SIS-177 b288 2-17-80 Replace base plate and anchors Work performed and support returnei ACS-309 to operating cendition.
h290 2-19-80 Replace base plate and anchors Work perfor=ed and support returnei ACS-307 to operating condition.
h216 2-13-80 Modify ACS-314. Work performed and support returned to operating condition.
h6h6 2-27-80 Modify ACS-13h. Work performed, pipe restraint returned to opersting condition.
L
o Monthly Operatiens Repo-March 1980 g
?sge Eight t , k
!!. MA!rI~IA' ICE (Sig * ~-- Safety Related)
M. O.
- Data I :escri;:::n i Correcti. e Ac ::n h6hh 2-2h-80 Modify SIS-160 pipe restraint. Work performed, pipe restraint f returned to operating condition.
hh5h 2-19-80 Modift ACS-115A pipe restraint. Work performed, pipe restraint returned to operating condition. -
hh70 2-22-80 Modify WJS-183 pipe restraint. Work performed, pipe restraint returned to operating condition.
kh71 2-19-80 Modify WDS-155 pipe restraint. Work performed, pipe restraint returned to operating condition.
h801 2-23-30 Modify ACS-121 pipe restraint. Work performed, pipe restraint returned to operating condition.
h673 2-27-80 Modify ACS-115 pipe restraint. Work performed. Pipe restraint-returned to operating condition.
h651 2-28-80 Modify RCS-16 pipe restraint. Work perfomed, pipe t estraint returned to operating c ndition.
h806 2-28-80 Modify ACS-240 pipe restraint. Work performed, pipe restraint !
returned to operating condition.
b601 2-2k-80 Modify ACS-127/127A pipe restraint. Work performed, pipe restraints returned to operating condition.
h213 2-27-80 Replace baseplate for ACS-302 pipe Work performed, pipe restraint restraint. returned to operating condition.
b0hh 2-7-80 Replace baseplate for CEVS-50 pipe Work performed, pipe restraint restraint. returned to operating condition.
h135 2-21-30 Modify ACS-129 pipe restraint. Work performed, pipe. restraint returned to operating condition.
bO8h 2-17-80 Remove FWH-157 pipe restraint. Work ccmpleted, restraint removed.
h086 2-9-80 Modify SIS-9h pipe Restraint. Work performed, pipe restraint
'eturned to operating condition.
r kl09 2-27-80 Modify SIS-15h pipe restraint. Work perfor=ed, pipe restraint returned to opr: rating condition.
h216 2-13-30 Modify ACS-31h. - Work performed, support returned- ,
to operating c:ndition.
I I
Men:hly Operatices Report March 1980
?sge Nine II. MAIN':~ZIXICI (Significan: Safety Related) ,
- t. O.
- I Ja:e i Descri;; ten i ;crrec::ve Ac: ten h082 2-12-80 Modify AGS-303 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
hh66 2-19-80 Modify ACS-119 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
3903 2-1-80 Repair ACH-367/ACS-18h pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.
383.0 2-1-80 Replace baseplate RWS-52 pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.
3831 2 h-80 Replace baseplate RWS-97 pipe Work perfomed, pipe restraint restraint, returned to operating condition.
3832 2 h-80 Replace baseplate VDS-1 pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.
3833 2-2-80 Replace anchors ACS-TT pipe Work performed, pipe restraint restraint. returned to operating condition.
383h 2-1-80 Replace Baseplate ACS-188 pipe Work performed, pipe restraint restraint. returned to operating condition.
3839 2 h-80 Replace 3aseplate VDS-1A pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.
3909 2-3-80 Replace Baseplate ACS-72 pipe Work perfomed, pipe restraint restraint. returned to operating condition.
h046 2-9-80 Replace kneebrace plate ACS-202 Work perfor=ed, pipe restraint pipe restraint. retuned to operating condition.
h080 2-12-80 Replace baseplate ACS-186 pipe Work performed, pipe restraint restraint. returned to operating condition.
3893 2-1-80 Grout holes near SIS-56 pipe Work perfor=ed, pipe restraint restraint. retu ned to operating condition.
3970 2-11-30 Replace anchors ACS-66 pipe Work performed, pipe restraint restraint. returned to operating condition.
- 39h9 2-2-80 Repair baseplate / anchors SIS-5 Work perfor=ed, pipe restraint pipe restraint. returned to operating condition.
l l 39h8 2-2-80 Replace baseplate / anchors ACS-220 Work performed, pipe restraint pipe restraint, returned to operating condition.
Monthly Operations Repor.
March 1980 ,
36 j da II. MAIET.UTCI (5ignificant Safety Related)
- L 3.
- 21:e i Des:ri :::n t ::rree:17e A::::n 393h 2-1-80 Replace anchors RWS h6A pipe Work performed, pipe restraint restraint. returned to operating condition.
h198 2-29-80 Modify SIS-13h pipe restraint. Work performed, pipe restraint returned to operating condition.
h257 2-16-80 Modify RCS-29 pipe restraint. Work performed, pipe restraint returned to operating condition.
h085 2-13-80 Replace baseplate / anchors ACS-306 Work perfor=ed, pipe restraint pipe restraint. returned to operating condition.
3908 2-1-80 Replace baseplate / anchors SIS-8h Work performed, pipe restraint pipe restraint. returned to operating condition.
4008 2-6-80 Modiff ACS-60 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
h030 2-9-80 ModiP/ RWS-62 pipe Restraint. Work performed, pipe restraint returned to operating condition.
3837 2-8-80 Replace anchors F4S-7 pipe restraint, Work performed, pipe restraint returned to operating condition.
4007 2-5-80 Modify 74H-11 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
h009 2 h-80 Modiff SIS-68 pipe restraint. Work performed, pipe restraint returned to operating condition.
4010 2 L-80 Modify SIS-97 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
h258 2-16-80 Modify SIS-183 pipe restraint. Work performed, pipe restraint returned to operating condition.
h032 2-8-80 Modiff CHVS-89 pipe restraint. Work perfor ed, pipe restraint returned to operating condition.
h212 2-15-80 Modify ACS-301 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
3358 2-12-80 Modiff SIS-69 (Revork) pipe Work performed, pipe restraint restraint. returned to operating condition.
h029 2-5-80 Modify SIH-86 pipe restraint. Work perfor ed, pipe restraint
' returned to operating condition.
Monthly 0 erations 2eper-
? ven D II. MAIT I*A3CI (3ignifican: 3afe y Related)
- 1. 3.
- Date i Descr:c: en J :crree: ve A: ::n h028 2 h-80 Modify SIS-89A pipe restraint. Work performed, pipe restraint returned to operating condition.
h259 2-lh-80 Modify ACS-30h pipe restraint. Work performed, pipe restraint returned to operating condition.
h212 2-1h-80 Modify ACS-31hA pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.
kO33 2-8-80 Modify WDH-155 pipe restraint. Work performed, pipe restraint returned to operating condition.
h215 2-15-80 Replace baseplate / anchors ACS-227 Work performed, pipe restraint pipe restraint. returned to operating condition.
hoh9 2-5-80 Replace baseplate / anchors WDS-277 Work performed, pipe restraint pipe restraint. returned to operating condition.
h031 2-6-80 Replace anchors CHVS-52 pipe Work performed, pipe restraint restraint. returned to operating condition.
h668 2-21-80 S.I. HCV-331 LPSI injection valve Replace "3" svitch on open notor breaker trips when valve is contactor.
operated.
2526 2-18-80 Replace C.R. 120 centact arm Replaced 53 - 1" contact arm retainers, retainers.
LO26 2-28-80 AC 3A leaking dash pot, failed Changed AC, 30 and Cd trip coils, CP-AC-3A, AD, 30, C$ on trip coils, recalibrated trip settings.
2587 2-20-80 Inspect SI-159 contain=ent check Inspection perfor ed, valve valve (ISI Inspection} for opera- reinstalled using new gaskets.
tional.
4218 2-13-80 Radiator leaking on #2 diesel Leak repaired, pressure tested generator. at 30 psi.
13610 2-20-80 TCv-2897A component cooling valve Gaskets changed using new gaskets.
leaking.
3hl6 2-8-80 HCV-78803 rav vater outlet valve The open and close: 1.1=its were vill not open or close. "A" Rav adjusted, valve now operating Water EX. correctly.
21h19 2-17-80 Aux. Feedvater HCV-1107A and Adjusted limit switches, working HCV-1108A valve indicating lights properly.
did not indicate proper valve i - 4 p r i- i : --y ' 3 -
7e*.-c'
Men hly Cperaticas Reper-March 1980 g
?ase Twelve 0 II. MA C IA:ICI (3 gnifi:an: Safety ?.ela ed! ,
O. = '
Cate 1 Jesert;;;: I ;crrective A::::n __j 570 2-7-80 Annunciator light on A 3h-2 for Annunciator card loose in rack, CRHS-Al Auto Standby 86Al-CRHS replaced. card'and tested annun-failed to relight after ST-ESF-2,F.1. ciator by test button, checked CK.
h205 2-7-80 CH-PCV-210 Letdown Pressure Control Replaced trim and repacked.
valve leaks under hydro.
kh77 2-20-80 "A" Boric Acid storage tank level Repaired transmitter on CP-261 CVCS LIA-261 has bad transmitter. and CP-25h. New bellows assy.
installed and calibrated on CP-261 and CP-25h.
klh2 2-29-80 R.P.S. - A.P.D. Channel "C" positive Replaced module and calibrated.
limit control irratic when adjusting, hh58 2-lk-80 R.C. Loop, hot leg temp. T.T.C. 122H Replaced power supply.
transmitter erratic near 50 milli-asps.
~
h656 2-20-80 E.S.F. - SI-2 FW-6 Tt=er. Did not Exercised timer and lubricated.
time out per spec. ST-ESF-2, F.3, Step 3.f.
h216 2-13-80 Modify ACS-314. Work perfor=ed, support returned to operating condition.
h252 2-28-80 Modify ACS-267 Work perfor=ed, support returned to operating condition.
h253 2-lh-80 Modify ACS-300. Work performed, support returned to operating condition.
h25h 2-lh-80 Modify S!S-178. Work performed, support returned to operating condition.
h255 2-26-80 Modify SIS-lT9 Work performed, support returned to operating ccndition.
h217 2-lh-80 Replace existing baseplate and. Work perfor ed, support returned anchors ACS-311. to operating condition.
h516 3-12-80 Sody to bonnet leak en HCV-306 on Replace gaskets, (seal ring).
HPSI Discharge Isol. Valve.
h858 3-10-80 Leak en Lover bypass valve body Installed two nev 8" 600 lb. flex flange, FCV-326. gaskets.
I
4 ,o.'
Menthly Operations Repor. t\n March 1980 g b Page Thirteen \)
!!. MA L.riAN02 (3ignifi:an Safe:/ 3 elated)
M. O.
- Cate l Descripti:n { Ocrrective Acti:n h882 3-12-80 Inspected limit switch gear box for Gear box HCV-311 grease OK.
possible drying and/or hardening of grease.
3762 3-11-80 Diesel Generator D2 regulator amps Replaced Diode 62D with Syl.
vent to 550 amps before it could be ECG-526h - ran at 110% rated load tripped, voltage regulator did not for 2 hrs., checked OK.
control.
h726' 3-19-80 Auxiliary Feed CR-120 Relay burned . Replaced with new CR-120 relay.
up.
4252 2-26-80 Modify ACS-267 Work performed, support returned to operating condition.
h253 2-lh-80 Modify ACS-300. Work performed, support returned to operating condition.
h25h 2-lh-80 Modify SIS-178. Work performed, support returned to operating condition.
h255 2-26-80 Modify SIS-179 Work perfor=ed, support returned to operating condition.
h217 2-1k-80 Replace existing baseplate and Work perfomed, support returned anchors ACS-311. to operating condition.
h083 2-12-80 ModiP/ SIS-168A pipe restraint. Work performed, pipe restraint returned to operating condition.
- a 4
- ,