Monthly Operating Rept for Mar 1980
ML19305D683
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/02/1980
From: Hickle B
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML19305D680 List:
References
NUDOCS 8004150395
Download: ML19305D683 (17)


Text

-

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-285 ,,

UNIT Fort Calhoun #1 DATE April 2, 1980 COMPLETED BY B. J. Hickle TELEPHONE 402-536-4413 MONT11 March, 1920 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0.0 37 0.0 2 0.0 18 0.0 3 0.0 39 0.0 4 0.0 20 0.0 5 0.0 21 0.0 6 0.0 22 0.0 7 ,a 0.0 23 0.0 8 0.0 24 0.0 9 0.0 25 0.0 10 0.0 26 0.0 1 0.0 27 0.0 12 0.0 28 0.0 13 O_0 29 0.0 14 0.0 30 0.0 15 0.0 3 0.0 16 0.0 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

8 004150 M r - _

~

OPERATING DATA REPORT -

DOCKET NO. 50-285 DATE April 2.1980 -

CO3tPLETED BY B. J. Hickle TELEPilONE 402-536-4413 i

OPERATING STATUS Fort Calhoun Station Unit No.1 N 8'5

1. Unit Name:
2. Reporting Period: March. 1980
3. Licensed Thennal Power (31Wt): 1420
4. Nameplate Rating (Gross 31We): 502
5. Design Electrical Rating (Net SlWe): 457
6. Stasimum Dependable Capacity (Gross 31We): 401
7. Stasimum Dependable Capacity (Net 31We): 45/
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Leve: To Which Restricted. If Any (Net 31We): .N/A
10. Reasons For Restrictions. If Any: N/A This alonth Yr.-to-Dat e Cumulative I1. Ilours In Reporting Period 744.0 2,184.0 57,121.0
12. Number Of flours Reactor Was Critica! 0.0 432.9 44.834.5
13. Reactor Resene Shutdown !!ours 0.0 0.0 1,309.5 14.11ours Generator On.Line 0.0 430.5 43.881.6
15. Unit Rewne Shutdown flours 0.0 0.0 0.0
16. Grow T hermal Energy Generated (31Wil) 0.0 574,730.9 53.809.760.2 .
17. Gross Electrical Energy Generated (31Wil) 0.0 - _. 190.604.0 17.850.833.6 IS. Net Electrical Energy Generated (31Wil) 0.0 180.935.1 16.868.454.9
19. Unit Senice Factor 0.0 19.7 76.8
20. Unit Availability Factor 0.0 19.7 76.8
21. Unit capacity Factor (Using alDC Net) 0.0 18.1 65.1
22. Unit Capacity Factor (Using DER Nat) 0.0 18.1 64.6
23. Ucit Forced Outage Rate 0.0 0.0 4.5
24. Shutdowns Scheduled Oser Nest 6.\lonths (Type. I) ate,and Duration of Each t: _

None

25. If Shut Down At End Of Report Period Estimated Date of Startup: April 15, 1980
26. Units in Test Status IPrior to Commercial Operationi: Foreca's: Achiesed IN111A L CRITICA LITY INITIAL ELECTRICITY Coll \lERCIA L OPER A TION (9/77) o

1 UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 s

DATE April 2,1980 COMPLETED sii B. J. Hickle REPORT MONTil Mar.ch,1980 TELEPif0NE ID2-536-4413

% O C No. Date c-

.!E T. E

'h 4Y5 jE$

Licensee ,En, hL Cause & Corrective

$ Event u? o. 3 Action to S j@ $ 3gj=s Report r 80 $U Prevent Recurrence e o C

80-01 800118 5 1753.5 C 1 N/A Reactor shutdown for annual refueling and maintenance outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparatio'n of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I-Same Source (9/77) li Other (Explain)

Refueling Infonnat'on Fort Calhoun - Unit No.1 .-

Report for the nonth ending March 31, 1980_. .

' l. Scheduled date for next refueling shutdown. - / March 15. 1981 May 15, 1981

2. Scheduled date for restart following refueling.
3. Will refueling or rcsumption of operation thereafter require a technical specification change or other No license anendaent?
a. If ans'<.cr is yes, what, in general, will these be?
b. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Contnittee to deter-mine whether any unreviewed safety questichs NO are associated with the core reload.
c. If no such review has taken place, when is February 1, 1981 it scheduled?
4. Scheduled date(s) for submitting proposed licensing action and support infonration.
5. Inportant licensing considerations associated with refueling, e.g. , new or different fuel design or supplier, unrevicsud design or perfonnance analysis nuthods, significant changes in fuel design, new operating procedures.

133 assemblics G. The number of fuel assemblics: a) in the core "

b) in the spent fuel pool 197 c) spent fuel pool.

storage capacity 483 d) planned spent fuel pool 483 storage capacity

7. The projected date of the last refueling that can be discharged to the spent fuel pool assunting the.present licensed capacity. '1985 Prepared by_ -

dZ/>y4/) Date March 31, 1980 1 <

OMAHA PU3LIC POWER DISTRICT Fort Calhoun Station Unit No. 1 March 1980 Monthly Operations Report b I. OPERATIONS SU'UARY Fort Calhoun re=ained in a refueling configuration during the month of March.

Maintenance of systems is continuing. Several refueling surveillance tests were ec=pleted during March. The plant is being placed in a startup configuration while avaiting completion of the I.E. Bulletin 79-02 and 79-lh work.

The special Nuclear Regulatory Com=ission task force on the i=ple=enta-tion of NUP.EG-0578 short ter reco==endations visited the site in early March. No significant proble=s were uncover ed and efforts are continu-ing to co=plete the changes.

One new e=ployee was added to the Operations Department in the position of au: ciliary operator (nuclear) .

The Supervisor-Operations attended a meeting in Windsor, Connecticut to review the E=ergency Procedure guidelines to be sub=itted to the NRC staff frc= the Combustion Engineering owners group.

Other operations duties were performed as scheduled.

A. FIRFORMANCE CHARACTERISTICS LER Nu=ber Deficiency LER-005 An inadvertent radi-active gas release to the atmosphere occurred due to failure of the rupture disk used to protect the reactor con-tain=ent from overpressurization during the Contain=ent Integrated Leak Rate Tes (ILET).

The release was within Technical Specification Limits.

LER-005, Rev. 1 An inadvertent radioactive gas release to the atmosphere occurred due to failure of the rupture disk used to protect the reactor con-tainment frc= overpressurization during the Contain=ent Integrated Leak Rate Test (IIST).

The release was within Technical Specification Limits.

LER-007, Rev. 1 During the review required by I.E. Bulletin (1979)79-013, the ste= =ounted limit switches on-HCV-86h and ECV-865 (charcoal filter spray supply) were found to not be environmentally qualified. The li=it switches provide pcsition indication ouly and vill not jeopardize valve control or cparability.

. t Monthly Operations Report. ,

C' f 500@(BR$RM q A. PERFOR WICE CEARACTERISTICS (Continued) 4 LER :iu=ber Deficiency ,

i LER-007, Rev. 2 During the review required by I.E. Bulletin  !

(1979)79-013, the limit switches on ECV-7h2A/C .

(contain=ent purge syste=) and ECV-72hA and T25A (contiainment filter unit da=pers) were found to not be environ =entally qualified.

The limit switches provide: valve indication only and vill not .jeopardi:fe valve control or operability. ,

LER-007, Rev. 3 During the review required by I.E.79-013 (1979) the Barksdale pressure switch which inter-i locks with a containment isolatica signal to isolate the instrument air header on lov

' header pressure and contain=ent isolation was found to not have environmental qualifications.  !

The 7perators have been instructed to manually

'. 1solate the containment instru=ent air header if low pressure is indicated during an accident.

3. CHANCES IN OPERATING METHODS i

None ,

C. RESULTS OF SURVEILLANCE TESTS A'ID INSPECTIONS ,

None .i i

k l D. CFANGES, TESTS AND EXPERI'CITS CARRIED CUT WITHOUT CCMMISSION APPROVAL L Procedure Description SP-FE-3 Eddy current testing of Irradiated Fuel Assembly 4

Guide Tubes.

SP-FWRG-2 Radiographic Exa=ination of Feedvater Line-Welds.

E. RESULTS OF LEAK RATE TESTS  !

Plant staff continued testing penetrations (Type C tests) during the =cnth of March. No abnormal leak rates vere found during this period. A combined leak rate test results report vill be written at the conclusion of the refueling outage.

F. CHAUGES IN. PLANT OPERATI'IG STAFF >

One new employee was added to the Operations Department in the position of Auxiliary Operator (Nuclear).

l

Monthly Operations Report l

March 1980 h Page Three G. TRAINING u Training during the nonth of March included Radiation Protection for contract personnel working on site, requalification exacinations for the licensed operators and Cycle 6 training for all-operators.

-H. CHANGES, TESTS AND EXPERI C TS REQUIRING NUCLEAR _ REGULATORY COMMISSION AUTHORIZATION PURSUANT TO 10CFR50.59 None I k t

3 Approved by k 1 ) t ( d ager-Fori.Calhoun Station

Monthly Cperations Report March 1980 t age Four u gk

I. MA!': TINA 3CI (3ignifioant Safety Related)

" . 2. =  : ate i :escrintion 1  : rree:17e Act;:n h73h 3-21-80 RPS "A" Channel, indicated TCOLD Replac.ed module E.S. in TM/LP-6T.

fluctuating, input volta 6 s steady. Power calculator, performed ST-RPS-h.

hhT5 2-15-80 "D" TU-8 power supply, "D" 102, Hi Found faulty filter capacitor, pressuriner pressure , power supp17 repaired and set output voltage -

voltage is low.' 52.18 volts.

'I 501 3-28-80 CCW Supply to VA-83,.HCV h03A.will Blev moisture from transmitter not operate from switch in Cont.rol .

supply lines.

Room, to operate, turn air off to valve.

3996 3-25-80 Intermitting ground on BC Matrix Found wire from C to 3 Matrix power supplies. shorting to ground, repaired and insulating vire.

4877 3-19-80 Valve leak on H Purge.

2 Installed new k" rubber seat and asbestos gaskets.

h325 3-8-80 Spent resin. pump, WD-3h, packing Packing replaced, packing gland leaking. installed and double nuttad for j

security.

3506 3-1h-80 T indication fluctuates en Repaired cold solder connection, .

hbSCIP DV'4 when drawer is cleaned pin connections, moved.

h165 3-lh-80 LLSP setpoint drifts on caster Replaced bad relay contacts, and alarm. repaired cold older joint.

h833 3-21-80 Seal leak on "3" spent regent pump. Adjusted packing.

2h76 3-12-80 Inspected all ter=inal blocks and TBSC is a G.E. block (NDWC fan, all ju.ction boxes inside centainment not Safety Related). All others to determine type and if they are are States.

covered with R.T.7.-

i 2597 3-18-80 Vent fitting en flange at RC-100 Flange was r<. moved, existing veld has defective svage lock fitting. metal on enage lock removed and veld socket cleaned. New fittingt velded into flange, LP tests per-

.i formed on veld, flange installed using new gasket.

~L975 3-31-80 Modify restraint SIS-30/SI'I-108. Snubber and hardware restored to operating condition.

I I

Mon bly Operations aeport g b March 1980 QD

?S4e Five su h II. MArrmsc (significan: safety aeia:ed)

X. J.

  • I Ca:e i 3escrip:1:n i  : rrective A ::::

4369 3-27-80 Modify pipe restraint SIS-123 Work performed, snubber and hardware returned to operating condition.

h173 3-T-80 Modify pipe restraint SIS-167 Work performed, snubber and hard-vare returned to operating condi-tion.

b983 3-30-80 Modify pipe restraint SIS h and Work performed, snubber and hard-SIS hA. vare returned to operating condi-tion.

hTTh 3-25-80 Modify pipe restraint SIS-10hA. Work performed, snubber and hard-vare returned to operating condi-tion.

4173 3-7-80 Modify pipe restraint SIS-167 Work performed, snubber and hard-vare returned to operating condi-tion.

h369 3-27-80 Modify pipe restraint SIS-123 Work perfor ed, snubber and hard-vare returned to operating condi-tion.

h321 3-7-80 Modify pipe restraint SIS-128. Work performed, snubber and hard-vars; returned to ope ; ting condi-tion.

h8h7 3-lh-80 Modify SIS-127A. Work pec'a ced, support returned to operating condition.

hh50 2-19-80 Modify FWS kh. Work performed, support rettrned to operating condition.

% 07 2-22-80 Modify MSS-T. Work perforned, support returned to operating condition.

h395 3-11-80 Modify acH-58. Work performed, hanger returned to operating condition.

hh08 2-16-80 Modify ACS-109 Work performed, support returned to operating condition, bh10 2-19-80 Modify-ACS-118. Work performed, support returned to operating condition.

- ! hh11 2-19-80 Modify Acs-128. Work perfor=ed, support returned to operating condition.

t

Monthly Cperations Repc.9 March 1980 lI. YAr.CMCI (Significan Safety Related)

M. 3.

  • Ja:e i Jescri::1:n Corree:1re Action t hh67 2-19-80 Modify ACS-279 Work performed, support returned to operating condition.

hh68 2-22-80 Modify ACS-116. Work performed, support returned to operating condition.

hh69 2-19-80 Modify ACS-133 Work performed, support returned to operating condition.

5029 3-28-80 Modify ACH-3h7 Work performed, hanger returned to operating condition.

h908 3-25-80 Modify FWS-67 Work performed, support returned to operating condition.

h251 3-28-80 Modiff FPS-17 Work performed, support returned to operating condition.

4975 3-31-80 Modify SIS-3 and SIH-108. Work perfor=ed, support returned to operating condition.

hh52 2-17-80 Modif/ MSS-8D. Work performed, support returned to operating condition.

4149 3-7-80 Modiff SIS-152. Work performed, support returned to operating condition.

h050 2-6-80 Modify WS-57 Replaced existing baseplate and anchors.

h0h8 2-6-80 Modify WS-79 Replaced existing kneebrace and anchors.

h622 3-3-80 Modif/ Wi-1103. Work perfor=ed, support returned to operating condition.

h62k 2-22-80 ModiP/ WS-1C. Work performed, support returned to operating condition.

k625 2-29-80 Modify RCS-1. Work performed, suppor returned to operating condition, h6h3 2-28-80 Modify ACS-223 Work perfor:ed, support returne:i to operating condition.

h803 2-29-80 Modiff SIH-177 Work perfo med, ha per returned to operating condition.

L

Monthly Operatices Report March 1980 0 b

?sge Seven g II. MA".nf2'LCICI (3ignificant safety Related)

M. 2. * ,

Cate 1 :escription s :orrective A::::n h67h 2-22-80 Modify SIH-187 Work perfor ed, henger returned to operating condition.

480h 2-2h-80 Modify SIH-197 Work performed, hanger returned to operating condition.

h620 2-22-80 Modify ACS-120/ACH-329 Work perfor ed, hanger and support returned to operating condition.

h621 2-22-80 Modify ACS-122. Work performed, support returned to operating condition.

h623 2-2h-80 Modify SIS-165A. Work performed, support returned to operating condition.

b6h9 2-28-80 Modify SIS-16h. Work perfor=ed, support returned to operating condition.

4081 2-10-80 Modify RWS-8h. Work performed, support returned to operating condition.

hh09 2-19-80 Modify ACS-113 Work performed, support returned to operating condition.

hoh5 2-9-80 Modify WDS-266. Work performed, support returned to operating condition.

3829 2 h-80 Replace baseplate at RWH-11h. Work perfor=ed, hanger returned to operating condition.

3596 2-27-80 Broken support en leak off line Revelded support to former locaticm HCV-2hl.

h260 2-16-80 Modiff ACS-313/and ACH-309 Work performed, hanger and support returned to operating condition.

h289 2-16-80 Relocate ACH-363 Relocated adjacent to SIS-177 b288 2-17-80 Replace base plate and anchors Work performed and support returnei ACS-309 to operating cendition.

h290 2-19-80 Replace base plate and anchors Work perfor=ed and support returnei ACS-307 to operating condition.

h216 2-13-80 Modify ACS-314. Work performed and support returned to operating condition.

h6h6 2-27-80 Modify ACS-13h. Work performed, pipe restraint returned to opersting condition.

L

o Monthly Operatiens Repo-March 1980 g

?sge Eight t , k

!!. MA!rI~IA' ICE (Sig * ~-- Safety Related)

M. O.

  • Data I :escri;:::n i Correcti. e Ac ::n h6hh 2-2h-80 Modify SIS-160 pipe restraint. Work performed, pipe restraint f returned to operating condition.

hh5h 2-19-80 Modift ACS-115A pipe restraint. Work performed, pipe restraint returned to operating condition. -

hh70 2-22-80 Modify WJS-183 pipe restraint. Work performed, pipe restraint returned to operating condition.

kh71 2-19-80 Modify WDS-155 pipe restraint. Work performed, pipe restraint returned to operating condition.

h801 2-23-30 Modify ACS-121 pipe restraint. Work performed, pipe restraint returned to operating condition.

h673 2-27-80 Modify ACS-115 pipe restraint. Work performed. Pipe restraint-returned to operating condition.

h651 2-28-80 Modify RCS-16 pipe restraint. Work perfomed, pipe t estraint returned to operating c ndition.

h806 2-28-80 Modify ACS-240 pipe restraint. Work performed, pipe restraint  !

returned to operating condition.

b601 2-2k-80 Modify ACS-127/127A pipe restraint. Work performed, pipe restraints returned to operating condition.

h213 2-27-80 Replace baseplate for ACS-302 pipe Work performed, pipe restraint restraint. returned to operating condition.

b0hh 2-7-80 Replace baseplate for CEVS-50 pipe Work performed, pipe restraint restraint. returned to operating condition.

h135 2-21-30 Modify ACS-129 pipe restraint. Work performed, pipe. restraint returned to operating condition.

bO8h 2-17-80 Remove FWH-157 pipe restraint. Work ccmpleted, restraint removed.

h086 2-9-80 Modify SIS-9h pipe Restraint. Work performed, pipe restraint

'eturned to operating condition.

r kl09 2-27-80 Modify SIS-15h pipe restraint. Work perfor=ed, pipe restraint returned to opr: rating condition.

h216 2-13-30 Modify ACS-31h. - Work performed, support returned- ,

to operating c:ndition.

I I

Men:hly Operatices Report March 1980

?sge Nine II. MAIN':~ZIXICI (Significan: Safety Related) ,

t. O.
  • I Ja:e i Descri;; ten i ;crrec::ve Ac: ten h082 2-12-80 Modify AGS-303 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

hh66 2-19-80 Modify ACS-119 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

3903 2-1-80 Repair ACH-367/ACS-18h pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.

383.0 2-1-80 Replace baseplate RWS-52 pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.

3831 2 h-80 Replace baseplate RWS-97 pipe Work perfomed, pipe restraint restraint, returned to operating condition.

3832 2 h-80 Replace baseplate VDS-1 pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.

3833 2-2-80 Replace anchors ACS-TT pipe Work performed, pipe restraint restraint. returned to operating condition.

383h 2-1-80 Replace Baseplate ACS-188 pipe Work performed, pipe restraint restraint. returned to operating condition.

3839 2 h-80 Replace 3aseplate VDS-1A pipe Work perfor=ed, pipe restraint restraint. returned to operating condition.

3909 2-3-80 Replace Baseplate ACS-72 pipe Work perfomed, pipe restraint restraint. returned to operating condition.

h046 2-9-80 Replace kneebrace plate ACS-202 Work perfor=ed, pipe restraint pipe restraint. retuned to operating condition.

h080 2-12-80 Replace baseplate ACS-186 pipe Work performed, pipe restraint restraint. returned to operating condition.

3893 2-1-80 Grout holes near SIS-56 pipe Work perfor=ed, pipe restraint restraint. retu ned to operating condition.

3970 2-11-30 Replace anchors ACS-66 pipe Work performed, pipe restraint restraint. returned to operating condition.

39h9 2-2-80 Repair baseplate / anchors SIS-5 Work perfor=ed, pipe restraint pipe restraint. returned to operating condition.

l l 39h8 2-2-80 Replace baseplate / anchors ACS-220 Work performed, pipe restraint pipe restraint, returned to operating condition.

Monthly Operations Repor.

March 1980 ,

36 j da II. MAIET.UTCI (5ignificant Safety Related)

L 3.
  • 21:e i Des:ri :::n t  ::rree:17e A::::n 393h 2-1-80 Replace anchors RWS h6A pipe Work performed, pipe restraint restraint. returned to operating condition.

h198 2-29-80 Modify SIS-13h pipe restraint. Work performed, pipe restraint returned to operating condition.

h257 2-16-80 Modify RCS-29 pipe restraint. Work performed, pipe restraint returned to operating condition.

h085 2-13-80 Replace baseplate / anchors ACS-306 Work perfor=ed, pipe restraint pipe restraint. returned to operating condition.

3908 2-1-80 Replace baseplate / anchors SIS-8h Work performed, pipe restraint pipe restraint. returned to operating condition.

4008 2-6-80 Modiff ACS-60 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

h030 2-9-80 ModiP/ RWS-62 pipe Restraint. Work performed, pipe restraint returned to operating condition.

3837 2-8-80 Replace anchors F4S-7 pipe restraint, Work performed, pipe restraint returned to operating condition.

4007 2-5-80 Modify 74H-11 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

h009 2 h-80 Modiff SIS-68 pipe restraint. Work performed, pipe restraint returned to operating condition.

4010 2 L-80 Modify SIS-97 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

h258 2-16-80 Modify SIS-183 pipe restraint. Work performed, pipe restraint returned to operating condition.

h032 2-8-80 Modiff CHVS-89 pipe restraint. Work perfor ed, pipe restraint returned to operating condition.

h212 2-15-80 Modify ACS-301 pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

3358 2-12-80 Modiff SIS-69 (Revork) pipe Work performed, pipe restraint restraint. returned to operating condition.

h029 2-5-80 Modify SIH-86 pipe restraint. Work perfor ed, pipe restraint

' returned to operating condition.

Monthly 0 erations 2eper-

? ven D II. MAIT I*A3CI (3ignifican: 3afe y Related)

1. 3.
  • Date i Descr:c: en J :crree: ve A: ::n h028 2 h-80 Modify SIS-89A pipe restraint. Work performed, pipe restraint returned to operating condition.

h259 2-lh-80 Modify ACS-30h pipe restraint. Work performed, pipe restraint returned to operating condition.

h212 2-1h-80 Modify ACS-31hA pipe restraint. Work perfor=ed, pipe restraint returned to operating condition.

kO33 2-8-80 Modify WDH-155 pipe restraint. Work performed, pipe restraint returned to operating condition.

h215 2-15-80 Replace baseplate / anchors ACS-227 Work performed, pipe restraint pipe restraint. returned to operating condition.

hoh9 2-5-80 Replace baseplate / anchors WDS-277 Work performed, pipe restraint pipe restraint. returned to operating condition.

h031 2-6-80 Replace anchors CHVS-52 pipe Work performed, pipe restraint restraint. returned to operating condition.

h668 2-21-80 S.I. HCV-331 LPSI injection valve Replace "3" svitch on open notor breaker trips when valve is contactor.

operated.

2526 2-18-80 Replace C.R. 120 centact arm Replaced 53 - 1" contact arm retainers, retainers.

LO26 2-28-80 AC 3A leaking dash pot, failed Changed AC, 30 and Cd trip coils, CP-AC-3A, AD, 30, C$ on trip coils, recalibrated trip settings.

2587 2-20-80 Inspect SI-159 contain=ent check Inspection perfor ed, valve valve (ISI Inspection} for opera- reinstalled using new gaskets.

tional.

4218 2-13-80 Radiator leaking on #2 diesel Leak repaired, pressure tested generator. at 30 psi.

13610 2-20-80 TCv-2897A component cooling valve Gaskets changed using new gaskets.

leaking.

3hl6 2-8-80 HCV-78803 rav vater outlet valve The open and close: 1.1=its were vill not open or close. "A" Rav adjusted, valve now operating Water EX. correctly.

21h19 2-17-80 Aux. Feedvater HCV-1107A and Adjusted limit switches, working HCV-1108A valve indicating lights properly.

did not indicate proper valve i - 4 p r i- i : --y ' 3 -

7e*.-c'

Men hly Cperaticas Reper-March 1980 g

?ase Twelve 0 II. MA C IA:ICI (3 gnifi:an: Safety ?.ela ed! ,

O. = '

Cate 1 Jesert;;;: I ;crrective A::::n __j 570 2-7-80 Annunciator light on A 3h-2 for Annunciator card loose in rack, CRHS-Al Auto Standby 86Al-CRHS replaced. card'and tested annun-failed to relight after ST-ESF-2,F.1. ciator by test button, checked CK.

h205 2-7-80 CH-PCV-210 Letdown Pressure Control Replaced trim and repacked.

valve leaks under hydro.

kh77 2-20-80 "A" Boric Acid storage tank level Repaired transmitter on CP-261 CVCS LIA-261 has bad transmitter. and CP-25h. New bellows assy.

installed and calibrated on CP-261 and CP-25h.

klh2 2-29-80 R.P.S. - A.P.D. Channel "C" positive Replaced module and calibrated.

limit control irratic when adjusting, hh58 2-lk-80 R.C. Loop, hot leg temp. T.T.C. 122H Replaced power supply.

transmitter erratic near 50 milli-asps.

~

h656 2-20-80 E.S.F. - SI-2 FW-6 Tt=er. Did not Exercised timer and lubricated.

time out per spec. ST-ESF-2, F.3, Step 3.f.

h216 2-13-80 Modify ACS-314. Work perfor=ed, support returned to operating condition.

h252 2-28-80 Modify ACS-267 Work perfor=ed, support returned to operating condition.

h253 2-lh-80 Modify ACS-300. Work performed, support returned to operating condition.

h25h 2-lh-80 Modify S!S-178. Work performed, support returned to operating condition.

h255 2-26-80 Modify SIS-lT9 Work performed, support returned to operating ccndition.

h217 2-lh-80 Replace existing baseplate and. Work perfor ed, support returned anchors ACS-311. to operating condition.

h516 3-12-80 Sody to bonnet leak en HCV-306 on Replace gaskets, (seal ring).

HPSI Discharge Isol. Valve.

h858 3-10-80 Leak en Lover bypass valve body Installed two nev 8" 600 lb. flex flange, FCV-326. gaskets.

I

4 ,o.'

Menthly Operations Repor. t\n March 1980 g b Page Thirteen \)

!!. MA L.riAN02 (3ignifi:an Safe:/ 3 elated)

M. O.

  • Cate l Descripti:n { Ocrrective Acti:n h882 3-12-80 Inspected limit switch gear box for Gear box HCV-311 grease OK.

possible drying and/or hardening of grease.

3762 3-11-80 Diesel Generator D2 regulator amps Replaced Diode 62D with Syl.

vent to 550 amps before it could be ECG-526h - ran at 110% rated load tripped, voltage regulator did not for 2 hrs., checked OK.

control.

h726' 3-19-80 Auxiliary Feed CR-120 Relay burned . Replaced with new CR-120 relay.

up.

4252 2-26-80 Modify ACS-267 Work performed, support returned to operating condition.

h253 2-lh-80 Modify ACS-300. Work performed, support returned to operating condition.

h25h 2-lh-80 Modify SIS-178. Work performed, support returned to operating condition.

h255 2-26-80 Modify SIS-179 Work perfor=ed, support returned to operating condition.

h217 2-1k-80 Replace existing baseplate and Work perfomed, support returned anchors ACS-311. to operating condition.

h083 2-12-80 ModiP/ SIS-168A pipe restraint. Work performed, pipe restraint returned to operating condition.