0 '
OPERATING DATA REPORT DOCKET NO.
50-321 DATE 4-10-80 COMPLETED BY J W. Roden TELEPHONE 912-3b/-//81 OPERATING STATUS
^
- 1. Unit Name:
Hatch Unit I N
5
- 2. Reporting Period:
3-80
- 3. Licensed Thermal Power (MWt): 2436 MWt
~
- 4. Nameplate Rating (Gross MWe):
809.3 Gross MWe
- 5. Design Electrical Rating (Net MWe):
777.3 Net MWe
- 6. Maximum Dependable Capacity (Gross MWe): 796.3 Gross MWo
~
764.3 Net MWe
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratmgs (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
t This Month Yr to.Date Cumulatise t
i1. Hours in Reporting Period 744 2184 37248 l
- 12. Number Of Hours Reactor Was Critical 744.0 1964.8 27762.9
(
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 744.0 1889J8 26158.2
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1760740 4306210 '.
54659245
- 17. Gross Elcetrical Energy Generated (MWH) 587040 1433050 17703990
- 18. Net Electrical Energy Generated (MWH) 563323_
1370842 16832775 i
- 19. Unit Senice Factor 100.0 86.5 70.2 i
- 20. Unit Availability Factor 100.0 86.5-70.2
- 21. Unit Capacity Factor (Using MDC Net) l 99.1 82.1 59.1
- 22. Unit Capacity Factor IU>ing DER Net) 97.4 80.8 58.1
- 23. Unit Forced Outage Rate 0.0 13.5 20.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
1
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY
(
INITIAL ELECTRICITY
~
COMMERCIAL OPERATION i
.c
+
- i. =.-
. = ~ _ _..
AVERAGE DAILY UNIT POWER LEVEL s
e s
DOCKET NO.
50-321 UNIT Hatch 1 DATE 4-10-80 COMPLETED BY J. W. RQyL TELEPHONE 912-367-7781 MONTH March 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(Mwe. Net)
~
761 37 763 2
574 18 768 3
706 39 762 4
769 751 20 5
770 21 '
772 6
773 753 22 7
766 753 23 8
759 24 771 9
761 7/3 25 to 767 754 26 772 774 27 12 773 771 28 13 773 755 29 14 771 759 30 15 759 775 3
16 768 INSTRUCTIONS On this format. list the average daily unir power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megswatt.
(9/77) l
~
i c
~
g
-~'
s-Q
.I
.. ;.,g.
9.c DOCKET NO.
50-321
- /;;.'; : ,1 UNITSilUIDOWNS AND POWER REDUCTIONS UNIT NAME Hatch 1
',i 2 80 DATE COMPLETED BY
- c. W. Roden REPORT MONTit March 1980 TELEPilONE 912-367-7781 l ',. ; i
'.*;., s t l y,
'5 E
E 't
~
f c
re Cause & Corrective Licensee c-*
g'3 g,,-
g, g
3_g 5
gg
~
g !; cc Event u3 Action to
'I 2o M
.c s$ 6 5
jigg Report #
<Eu ju Prevent Recurrence 1
6 e
i V
80-09 800302 S
0 H
4 NA ZZ CONROD Reduction for rod pattern e.6
. adjustment s
- (,
.,: A
, T;;
-4 I
2 3
4
/
F: Forced Reason:
Method:
Exhibit G -Instructions
'.[
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation oI Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Errur (Explain)
Exhibit 1 Same Source (9/77) llother(Explain) e
-n.,
.NARR ATIVE REPORT UNIT 1 March 2nd Reduction for rod pattern
[
adjustment i
There was no si.ngle release of radioactivity or s in gl.e radiation exposure which accounts fo" more than 105 of the t
allowable annual values during March of 1980.
h b
l E
h L
A i
I t
l i
t
?
i I
l e
ek s.
L n
L -
w
HATCH 1 SAFETY - RELATED MAINTENANCE 9EQUESTS TO BE REPORTED FOR MARCH 1080 s
NUMBER D ATE CO'iPLETED DESCRIPTION 80-1530 T!13-80 Replaced burned up relay on 1C11-J600 rod worth minimizer 80-1522 3-19-80 Inspected HPCI turbine main bearing pedestals for visust cracks 79-5683 3-10-80 Mounted and pulled cable fo" new in t a '< e structure heatea 79-92c0 3-24-80 Installed b lo 'f-eas in Rx but1.d-ing instrument
f e
e e
^
a an
__