Notifies That CEN-128,Response of C-E NSSS to Transients & Accidents Constitutes Response to short-term Analysis & Emergency Procedure Guideline Requirements of NUREG-0578, Section 2.1.9 (C)
ML19305D247
Person / Time
Site: Maine Yankee
Issue date: 04/10/1980
From: Groce R
Maine Yankee
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 WMY-80-64, NUDOCS 8004140308
Download: ML19305D247 (1)


Text

nm:

TURNPlKG ROAD (RT. 9)

  • "[

ENGINEERING OFFICE WESTBORO, MASSACHUSETTS 01581 g *

April 10, 1980 617-366-9011 xxr-O B.3.2.1 United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Office of Nuclear Reactor Regulation Mr. Darrell G. Eisenhut, Director Division of Project Management

Reference:

(1) License No. DPR-36 (Docket No. 50-309)

(2) C-E Owners Group Letter from G. E. Liebler to D. G. Eisenhut, dated April 1, 1980 (3) W C Letter from D. F. Ross, Jr. dated September 2, 1979 (4) NRC Letter from D. G. Eisenhut "To All Operating Nuclear Power Plants," dated September 13, 1979 (5) W C Letter from H. R. Denton "To All Operating Nuclear Power P] ants," dated October 30, 1979

Subject:

CEN-128 Response of Combustion Engineering Nuclear Steam Supply System to Transients and Accidents

Dear Sir:

Reference (2) transmitted the subject report on behalf of the C-E Owners Group in response to the requirements listed in References (3), (4), and (5).

The purpose of this letter is to inform you that this report is applicable to the Maine Yankee Atomic Power Station and constitutes our response to the short-term analysis and emergency procedure guidelines requirements of section 2.1.9(c) of NUREG-0578.

As stated in Reference (2), it is intended that the information contained in this report be used for the training of reactor plant operators and the revision of our emergency procedures if our review indicates that any procedure revisions would be beneficial.

It is our intention to proceed with the use of this report in order to meet the schedule requirements listed in Reference (4).

If you or your staff should require any additional information concerning the implementation of the information from CEN-128, please feel free to contact us.

Very truly yours, MAIE YANKEE ATOMIC POWER COMPANY b

Robert H. Groce Senior Engineer - Licensing RHG/kaf 80 0.414 03df

.