ML19305C678
| ML19305C678 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/05/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19305C679 | List: |
| References | |
| NUDOCS 8003310253 | |
| Download: ML19305C678 (2) | |
See also: IR 05000327/1979073
Text
,
WT-
!
fM uq
"Q'. p ,
y
jo,
UNITED STATES
'
'
y *g q *( ,g
NUCLEAR REGULATORY COMMISSION
,
- /g fi,gfg c
RE GION 11
0, h,%
8-
101 MARIETT A ST,, N.W., SUITE 3100
gW
,o
ATLANTA, G EORCI A 30303
.....
FEB 0 51980
In Reply Refer To:
RII:VI'C
50-327/79-73
,
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. T. Cottle
('
this of fice on *
December 1-31, 1979, of activities authorized by NRC Construction Permit No.
CPPR-72 for the Sequoyah facility, and to the discussion of our findings held
with J. M. Ballentine at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of . Sis inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. Tt se are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
thtt proprietary information identified in the application is contained in a
'
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.
i
.
20
'
8003330
,,
.
_ _ _ . . _ . . .
4
4
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
E.c.
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report No. 50-327/79-73
e
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
). L. Lambert, Project Engineer
'500 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
Construction Engineer
Post Office Box 2000
Spring City, Tennessee 37381
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, Tennessee 37902
.-
,
'
g
5
1
!
I
i
!
,
. .
- .
-
.
.
. - -