Text
T[U
UNITzD STATE?
'
lWCLE AP. REGUL ATORY COiE!SSION
H E G IOi, I V
7
C 11 F:V AN DL AZ A DRIVE. Suf TE 1003
.ge'
>
.
.....
February 15, 1980
In R ply Refer To:
RIV
Dockat No.
50-445/Rpt. 80-01
50-446/Rpt. 80-01
Texas Utilities Generating Company
.
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection activities performed by our Resident inspector,
Mr. R. G. Taylor, for the period of January 1980, of activities authorized by
NRC Construction Permits No. CPPR-126 and 127 for the Comanche Peak facility,
Units No. I and 2, and to the discussion of our findings with Mr. R. G. Tolson
,
and other members of your staff during the inspection period.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of the
NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."
The Notice of Violation for the item of noncompliance reported in the
enclosed inspection report was forwarded to you by our letter dated January
23, 1980; therefore, this letter does not require further response regarding
this matter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified
in paragraph 2 ef the enclosed report.
8003310 Y !,!
_. .
- ___ _
.
.
Texas Utilities Generating Company
2
February 15, 1980
Two new unresolved items are identified in paragraphs 4 & 6 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection repott will be placed in the NRC's P'ublic Document Room. If the'
report contains any information that you believe to be proprietary, it is
tiecessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
[
'
,
W.C.Seidk, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/80-01
50-446/80-01
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
1