Notice of Violation from Insp on 791227-28 & 800117-18
ML19305C591
Person / Time
Site: Zimmer
Issue date: 02/12/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19305C588 List:
References
50-358-79-37, NUDOCS 8003310122
Download: ML19305C591 (2)


Text

,

Appendix A NOTICE OF VIOLATION f

Cincinnati Gas and Docket No. 50-358 Electric Company Based on the results of an NRC inspection conducted on December 27-28, 1979, it appears that certain of your activities were not conducted in full compliance with NRC requirements as noted below. These items are infractions.

1.

10 CFR 50, Appendix B, Criterion X requires, in part, that a pro-gram for inspection activities affect.'g quality shall be estab-lished and executed to verify conformance with the drawings.

Paragraph 17.1.10 of the PSAR states, in part, " Inspections and tests are performed in accordance with written procedures which include requirements for check lists and other appropriate doc-umentation of the inspections and tests performed."

Contrary to the above, the piping suspension system '.nspection program had not been executed effectively by the que.lity control and field engineering personnel.

2.

10 CFR 50, Appendix B, Criterion VI requires, in part, that measures shall be established to control the issuance of documents, such as instructions.

Paragraph 17.1.6 of the PSAR states, in part, "... changes to..

documents are reviewed for adequacy and are distributed in a manner similar to the original document."

Contrary to the above, the use of the Inter-Office Memorandum (IOM) to replace requirements established in the work procedure was not considered appropriate in that the content of the IOM did not receive engineering and QA review, and that the IOM is not distributed and updated in accordance with the QA manual procedure.

3.

10 CFR 50, Appendix B, Criterion XIII requires, in part, that mea-sures shall be established to control the preservation of equipment in accordance with instructions to prevent damage.

Paragraph 17.1.13 of PSAR states, in part, ".... equipment manufac-turers' instructions prescribe controls for the onsite handling,..

and preservation of material and equipment in accordance with work i

and inspection instructions as necessary to prevent damage or deter-io ra tion. "

80033101Q m

O Appendix A -

. Contrary to the above, several installed Bergen-Paterson hydraulic snubbers were observed without accumulator indicator protective covers as requird by the manufacturer, and several of the snubbers were not property protected from physical damage.

4.

10 CFR 50, Appendix B, Criterion XVI requires, in that deficiencies and noncomformances be promptly identified and corrected.

Paragraph 17.1.16 of the Zimmer FSAR states, in part, " Deficiencies are normally resolved between QA&S and QA representatives of the vendor or constructor,"

Contrary to the above, the licensee's effort to prevent problems i

f rom recurring and to improve system measures af ter deficiencies have been identified was considered inadequate in that the above three apparent items of noncompliance are repetitious 4