ML19305C109

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800214 Interim Deficiency/Rept Re Nonseismic Equipment Installed Over Seismic
ML19305C109
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/05/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8003260003
Download: ML19305C109 (1)


Text

Tic

  1. "80eg UNIT ED STATES 8

NUCLEAR REGULATORY COMMISSION o

REGION 111 f

799 ROOSEVELT ROAD e

/

GLEN ELLYN,ILUNOl$ $0137 MAR 5 1980 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward liines,, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated February 14, 1980, pursuant to 10 CFR 50.55(e) regarding non-seismic equipment installed over seismic. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, s

?G G. Florelli, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR

-NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene. B. Thomas, Jr.,

Attorney i

l 800826o Q C) 3