ML19305B859

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-266/79-14 & 50-301/79-16 on 791011,1114-15,1217-19 & 800107-08
ML19305B859
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/07/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19305B861 List:
References
NUDOCS 8003200495
Download: ML19305B859 (2)


See also: IR 05000266/1979014

Text

  1. p @ "toog%

g

UNITED STATES

8 ' , ,,

" t,

NUCLEAR REGULATORY COMMISSION

,

U

' ' -

e

REGION lit

k

799 ROOSEVELT ROAD

o

GLEN ELLYN, ILLINOls 60137

.....

FEB

7 1980

Docket No. 50-266

Docket No. 50-301

Wiscor.an Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. K. D. Ward of this office

on Oc*.ober 11, November 14-15, December 17-19, 1979 and January 7-8, 1980,

of activities at the Point Beach Nuclear Plant, Unit I and 2 authorized

by NRC Operating License No. DPR-24 and DPR-27 and to the discussion of

our findings wita Mr. G. Reed of your staff and Mr. L. Albrecht of South-

west Research Institute and others of their staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report. will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

witahold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

s008200 4 9 s

3

.-

-Wisconsin Electric Power

-2-

FEB

'4 b80

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

7-

d

Icutt

.

. Ficrelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Rpt. No. 50-266/79-14

and No. 50-301/79-16

cc w/ enc 1:

Mr. G. A. Reed, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NISC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

i

I

- .

mW