ML19305B711
| ML19305B711 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/21/1980 |
| From: | Hancock J FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19305B710 | List: |
| References | |
| CS-80-54, NUDOCS 8003200125 | |
| Download: ML19305B711 (2) | |
Text
__ _ - _ _ _ - _ _ _ _ _ _ _.
(
\\
/
,3aCc O
r;' < 1 % ; 5-e
% ti. e qa
~
fC i i
o sMi
~
m ee o
- Q;::, -
,, S ja i.
--c a t,'
- h*3' S
h
.h d3
'7 Florida J
~
[>gyugggy 21 February 1980 to to,o....o~
3-0-3-a-2 03 CS-80-54
~
Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory commission Ref:
RII:JAD 101 Marietta St.,
Suite 3100 50-302/80-03 Atlanta, GA 30303
Dear Mr. O'Reilly:
We offer the following response to the apparent Item of Noncompliance in the referenced inspection report.
NOTICE OF VIOLATION As required by Technical Specification 4.3.3.2.b, the incore detector system shall be demonstrated operable at least once per 18 months by performance of a Channel Calibration which does not include the neutron detectors.
Contrary to the above, the incore neutron detectors, last calibrated in September 1977, were not calibrated by July 1979; the latest date permitted by Technical Specification 4.0.2.a.
The calibration was not completed until January 14, 1980.
Response: The immediate corrective action taken was to perform the Incore Neutron Detector System Calibration Surveillance Procedure, SP-140.
Those personnel responsible for the implementation of the required surveillance interval have been counselled as to the severity of missed surveillance pro-cedures and Procedure SP-140 has been revised to ensure the required surveil-lance interval is specified to be performed at a minimum every eighteen (18) months.
An impending organizational change for the new position of Surveillance Program Specialist, whose responsibility will include the tracking and scheduling of Surveillance Procedures performed and to be performed, will be effected.
In the interim, a contracted person has been assigned these responsibilities.
Full compliance has been achieved.
\\ 2*b s 0 032 00+sicut copy General Office 3201 Thirty fourtn street souin. P O Box 14042. st Petersburg Florida 33733 e 8t3-866-5151
t O
J. P. O'Reilly, Ref:
RII:JAD/80-03 Page 2 As stated in the referenced inspection report, Licensee Event Report (LER 50/302/80-005/03L-0) has been subraitted describing the apparent cause of this event, the analysis of the occurrence, and the corrective action that has been, and will be taken.
Should there be f urther questions, please contact us.
Very truly yours,
/
FLORIDA POWER CORPORATION 4
f a w lU O
,ff g,
j,'l W
./s t 4 '. Q. i.^! U f
f J. A. Hancock Nuclear Plant Manager Director, Nuclear Operations JC/rc
.