Forwards IE Insp Repts 50-266/79-19 & 50-301/79-21 on 791204-07,14-15 & 18.No Noncompliance Noted
ML19305B593
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/30/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burnstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19305B596 List:
References
NUDOCS 8003190952
Download: ML19305B593 (2)


See also: IR 05000266/1979019

Text

[m:%'o,,

' \\iit f],}

<

-

UNITED STATES

"~

E'

~

NUCLEAR REGULATORY COMMISSION

o

M

N

E

REGION lil

Y

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

.....

'.V y r -

-

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. J. D. Smith of this office

on December 4-7, 14-15 and 18, 1979, of activities at Point Beach Nuclear

Plant, Units 1 & 2 authorized by NRC Operating Licenses No. DPR 24 and

DPR-27 and to the discussion of our findings with Mr. G. A. Reed at the

,

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

j

a selective examination of procedures and representative records, obser-

i

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your. contractors believe to be proprietary, you must apply in writing

'

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

800s1e

952

i

o

t

.

Wisconsin Eleccric

-2-

gp3 3 t c3a ,

Power Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

hw

. Heishman, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

IE Inspection

Rpt. No. 50-266/79-19

and No. 50-301/79-21

cc w/ enc 1:

Mr. G. A. Reed, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

,