Text
b
4 e..
TN
UNITED STATES
p tgyq
4
o
NUCLEAR REGULATORY COMMIS510N
j
3
o
REGION I
3-
.$
s31 PARK AVENUE
"p
KING OF PRUS$3 A, PENNSYt.V ANIA 19406
JM 2 2.m
Dock 2t No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection Report No. 50-423/79-12
This refers to the inspection conducted by Mr. A. Cerne of this office
on December 27-28, 1979 at the Millstone Nuclear Power Station, Unit 3
at Waterford, Connecticut of activities authorized by NRC License No.
CPPR-ll3 and to the discussions of our findings held by Mr. Cerne with
Mr. S. Toth and others of your staff at the conclusion of_ the inspection,
and to a subsequent telephone discussion between Mr. Cerne and Mr. Toth
on December 31, 1979 and January 3, 1980.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In a::cordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor) _
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. . Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Occument Room.
8003190905
-,
..
_
s
..
Northeast Nuclear Energy Company
2
No reply'to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/obert T. Carls$"f
on, Chie
Reactor Construction and Engineering
Support Branch
. Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-423/79-12
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer