Forwards IE Insp Rept 50-387/79-39 on 791226-28.No Noncompliance Noted
ML19305B560
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/25/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML19305B561 List:
References
NUDOCS 8003190894
Download: ML19305B560 (2)


See also: IR 05000387/1979039

Text

YN

ga

UNITED STATES

]o

NUCLEAR REGULATORY COMMisslON

y

o

REGION I

$

, i .. {.

s31 PARK AVENUE

o'

. . 4

KING OF PRUSSI A PENNSYLVANIA 19408

g

s ..v /

...

JAN 2 5 1980

Docket No. 50-387

Pennsylvania Power & Light Company

ATTN: Mr. Norman W. Curtis

Vice President

Engineering and Construction (N-4)

2 North Ninth Street

Allentown, Pennsylvania 18101

Gentlemen:

Subject:

Inspection No. 50-387/79-39

This refers to the inspection conducted by Mr. H. Nicholas of this office on

December 26-28, 1979, at Susquehanna Steam Electric Station, Unit 1, Berwick,

Pennsylvania of activities authorized by NRC License No. CPPR-101 and to the

discussions of our findings held by Mr. Nicholas with Mr. J. Green of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

"

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the Nht's " Rules of Practice," Part 2, Tit le

10, Code of Federal Regulations, a copy of this letter and the enclosed in-

spection report will be placed in the NRC'

Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is nec;ssary that you make a written application within 20 days

to this office to witnhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

I

A

s003l9OU

j

_

_

.

.

Pennsylvania Power & Light Company

2

JAN 2 5 1980

No reply .to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

,

c -s

(

' J. Brunner, Chief

Re6ctor Operations and Nuclear

.

Support Branch

-Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-387/79-39

cc w/ encl:

A. R. Sabol, Manager, Nuclear Quality Assurance

W. E. Barberich, Licensing Engineer

S. H. Cantone, Superintendent of Plant

,

'

C