Forwards IE Insp Rept 50-271/79-20 on 791119-21.No Noncompliance Noted
ML19305B538
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19305B539 List:
References
NUDOCS 8003190863
Download: ML19305B538 (2)


See also: IR 05000271/1979020

Text

g

.

- 6

p as:

UNITE 3 STATES

p

o

NUCLEAR REGULATORY COMMisslON

[

yo

REGION I

/.$

631 PARK AVENUE

'

. . ,

'

g

KING OF PRUS$1 A. PENNSYLVANIA 19404

JAN 2 8 1980

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Robert L. Smith

Licensing Engineer

25 Research Drive

Westborough, Massachusetts 01581

Gentlemen:

Subject:

Inspection Report 50-271/79-20

This refers to the inspection conducted by Mr. T. Foley of this office on November

,

19-21, 1979 of activities authorized by NRC License No. DPR-28 and to the discussions

l

of our findings held by Mr. T. Foley with Mr. W. Conway of your staff at Vermont

Yankee Nuclear Power Station, Vernon, Vermont at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains-

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

!

Document Room.

I

8003190 $3

-

_

. _ _ _ _ _

.

-.

Vermont Yankee Nuclear Power

2-

JAN 2 8 IS60

Corporation

No reply to this letter is required; however, if you should have any questions

concerning this inspection,'we will be pleased to discuss them with you.

.

Sincerely,

/

E on J. Brunner, Chief

,

R ctor Operations and Nuclear

upport Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-271/79-20

cc w/ encl:

W. F. Conway, Plant Superintendent

Ms. J. Abbey, Technical Secretary

Mr. J. E. Griffin, President

-