I
ne
t NITED STATES
p
o
NUCLEAR REGULATORY COMMisslON
5
V
a
i
REGION I
!!
,*-Ly f,. e.$
/
,
'
.g,
-
631 FARK AVENUE
Kina or caussia, ecunsvevas:4 i,4o.
.....
,
.{
JAN 2 8 1980
Docket acs'. 50-245
'
50-336
S
i
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
.
Vice President - Nuclear
-
Engineering and 0,prations
P. O. Bor. 27.0
.
'
Hartford; Connecticist u 06101
'
'
/
,
,
Gentlemeji: i
e
j</
'
, , .
Subject:'Combiredjupection[50-245/79-28and50-336/79-29
.
This refers to the' inspection conducted by Mr. J. T. Shediosky of this office on
October 15 - November 30, 1979 at the Millstone. Nuclear Power Station, Waterford,
,
Connecticut of activities authorized by NRC License Nos. DPR-21 and DPR-65 and
.to the discussions of our findings held by Mr. Shediosky with Mr. Opaka and
other meders of your staff periodically during the inspection period.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and obserydtions by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with'.Section 2.790 of the NRC's '" Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or. your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such infonistion from publi' disclosure. Any such application must be
c
accompanied by an aff-/ davit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresser with specificity the items which will be
considered.by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to-be withheld shall be incorporated as far as
.possible into a separate part of the' affidavit.
If we <'o not hear from you in
this regard.within the specified peded, the report will be placed in the Public
Document Roc.m.
p
.
4
I
8003190 $
,
,
-
,
.
.
Northeast Nuclear Energy Company
2
IJAN 2 81980
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
den J. Brunner, Chief
Reacjtor Operations and Nuclear
Support Branch
Enclosure: Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-245/79 28 and 50-336/79-29
cc w/ enc 1:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himelwright, Licensing Safeguards Engineer
.
.
l
-
.
-
..
-
-