ML19305B507
| ML19305B507 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 12/07/1979 |
| From: | Holody D, Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19305B486 | List: |
| References | |
| 70-1100-79-10, NUDOCS 8003190821 | |
| Download: ML19305B507 (1) | |
Text
..
U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPt'CTION AND ENFORCEMENT O
aeoto" 1 Report No. J0-1100/79-10 Docket No. 70-1100 License No. SNM-1067 Safeguards Group 3
Licensee:
cnmhustion Enaineerina. IncorDorated P
O. Box 500
~
Windsor.' Connecticut 06095 Facility Name:
Nuclear Power Systems - Manufacturing Inspection At:
Windsor. Connecticut Inspection Conducted:
November 5-8, 1979 Date of Last Material Control and Accounting Inspection:
September 24-28, 1979 Type of Inspection:
Unannounced Material Control and Accounting Inspectors:
b- ().
/2.!3 !79 D. J. Holody, Mathematical Statistician date date date Approved by:
/
- sM
/2, / '//'79
. H. Joyner, h' f,IWclear Material control
/datt port Sec i
, Safeguards Branch Inspection Summary:
Areas Inspected:
Measurement and Statistical Controls, and Inventory Difference (10) and its associated limit of error (LEID).
-The inspection involved 29 inspector-hours on site by one NRC inspector and was begun during the regular hours.
-Results:
The licensr was found to be in compliance with NRC requirements in the two areas examined during the inspection except for the following items.
.1.
-A special nuclear material.(SNM) measurement control procedures manual was not developed and maintained.
2.
~A training program for personnel involved in SNM measurements was not
(
develt. ped and administered.
8003 y ggg Region.I Form 166-(August 1979)
..