ML19305B416
| ML19305B416 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/10/1980 |
| From: | Bryant J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19305B417 | List: |
| References | |
| NUDOCS 8003190627 | |
| Download: ML19305B416 (2) | |
See also: IR 05000327/1979072
Text
f('-
'
pa nao
G, -5.W
o
UNITED STATES
SL3
!
NUCLEAR REGut.ATORY COMMISSION
o
-
$
E
REGION il
'
/[
o,
101 MARIETTA ST
N.W., SUITE 3100
O
ATLANTA, GEORGIA 30303
g
JAN 101980
In Reply Refer To:
RII:MJG
50-327/79-72
50-328/79-35
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by M. J. Gouge of this office on
December 18-20, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the discus-
sion of our findings held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
i
l
I
/
Jack C.
ryant, Acting Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
(See Page 2)
8o031 0069:]
-
.
_-.
__
. . _ _
.
..
__.
.
[
JAN 101980
' Tennessee Valley Authority
-2-
_
Enclosures:
Inspection Report Nos. 50-327/79-72
and 50-328/79-35
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
.
P. O. Box 2000
Daisy, TN 37319
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
0
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, TN 37902
,
.
- .
.
--
-
--