ML19305B408

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-566/80-01 & 50-567/80-01 on 800122-24.No Noncompliance Noted
ML19305B408
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 02/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305B409 List:
References
NUDOCS 8003190612
Download: ML19305B408 (2)


See also: IR 05000566/1980001

Text

'f

Y

f

+

UNITED STATES

[

j-

NUCLEAR REGULATORY COMMISSION

g ..gg

REGION 11

g

a[e

101 MARIETTA ST

N.W., SUITE 3100

h7

0,

,

% *****[

ATLANTA. GEORGI A 30303

l'EB . 41930

In Reply Refer To:

RII:JJL

50-566/80-1

50-567/80-1

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

icntlemen:

This refers to the inspectica conducted by J. J. Lenahan of this office on

.

January 22-24, 1980 of activities authorized by NRC Construction Permit Nos.

CPPR-172 and CPPR-173 for the Yellow Creek facility, and to the discussion of

our findings held with M. M. Price at the conclusion of the inspection.

>

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

.

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that yo.1 make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

documen

If we do not hear from you in this regard within the specified period,

the repart will be placed in the Public Document Room.

_

9

4i*

k

8008190 C .t H

.

.-

.

_

. . . .

_.

. -

Tennessee Valley Authority

-2-

FEB - 41953

,

Should you.have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

J. C. Bryant, Acting Chie

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-566/80-1

and 50-567/80-1

cc w/ encl:

J. F. Cox

400 Commerce Street

,

W10C131 C-K

Knoxville,SV 37902

H. M. Price, Project Manager

.

P. O. Box 2000

'

Iuka, MS 38852.

D. L. Terrill, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

lf

-

,

e

4

. .

L

.m