Alabama Pow 6r Company
- ~
600 North 18tn Street Post office Box 2641 Birmingham. Alabama 35291 Telepnone 205 323-5341 m
F. L. CLAYTON, JR.
abarna Power Senior Vice President the south. n eectnc system w
March 14, 1980 Director Office of Management Infonnation
& Pr@aus Control U. S. Nuclear Regulatory Ormission Washington, D. C.
20555
Dear Sir:
Re: Jbseph M. Farley Nuclear Plant thit No.1 Docket No. 50-348 bbnthly Operating Data Peport Attached are two (2) copies of the February,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. 'As requested by letter frcm Mr. John F. Stol: to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Su:mury of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly,
$ Y Uw~
F. L. Clayton, Ur.
FICjr/INE/mnb Att h nts cc: Mr. 'Ibd Cintula (1 copy)
Director, IE (10 copies)
Director, Rll (1 copy) 1 1
Y%\\
80( 319 0 Q
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS FEBRUARY, 1980 On February 1, the unit outage for performing NUREG 0578 related design changes continued.
There were four (4) automatically initiated shutdowns, one (1) manual shutdown and four (4) controlled power reductions in the month of February.
The following safety-related maintenance was performed in February:
1.
Overhauled 1A and 1B Reactor Makeup Water Pumps.
2.
Overhauled vent air particulate radiation monitor RE-21.
3.
Installed valve position indicators on the POR's and pressurizer safety valves.
4.
Installed a core subcooling monitor.
5.
Replaced a bearing on th'e TDAFW pump.
6.
Repaired a casing leak and replaced bearings on "B"
MDAFW pump.
7.
Continued installing additional instrumentation on 1B charging pump.
.-