Forwards IE Insp Repts 50-518/79-30,50-519/79-30, 50-520/79-30 & 50-521/79-30 on 791126-1221.No Noncompliance Noted
ML19305B217
Person / Time
Site: Hartsville  
Issue date: 02/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305B218 List:
References
NUDOCS 8003190340
Download: ML19305B217 (2)


See also: IR 05000518/1979030

Text

!

Id

.mr

'

8

o'^

UNITED STATES

NUCLEAR REGULATORY COMMISSION

O'

n

$

~E

REGION il

8

101 MARIETTA sT, N.We,5UITE 3100

JdPC

S

,

%,*****,o[

ATLANTA, GnORGIA 30303

gg

FEB .41980

In Reply Refer To:

RII:WBS

50-518/79-30

50-519/79-30

50-520/79-30

50-521/79-30

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

,

Gentlemen:

,

This refers to the inspection conducted by W. B. Swan of this office on

November 26 - December 21, 1979, of activities authorized by NRC Construction

Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear

'

facility, and to the discussior, of our findings held with R. T. Hathcote at the

conclusion of the inspection.

Areas examined during the 'aspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.W

.

k

6

1

8 0 03190?i9f D

,

. -

[

ei+-

,sJum= =N , eee-*

a6,*,wm e, e odew d>m"e:

    • e u+w

-w e

-+'M**N-

e t -D's

h'm

  • * - *

T-

      • P.

= *

-#.-

r

.

Tennessee Valley Authority-

-2-

O

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

gy

+

J. C. BryYnt, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

'

-

Inspection Report Nos. 50-518/79-30,

50-519/79-30, 50-520/79-30 and 50-521/79-30

  • -

cc w/ encl:

R. T. Hathcote, Project Manager

P. O. Box 2000

>

Hartsville, TN 37074

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee

37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401