ML19305A834

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-012/03L-0,80-011/03L-0 & 80-010/03L-0
Date released: 11/15/2019 Download: ML19305A834


LER 80-010/03L-0:on 800212,during Mode 5 Operation, Discovered That Tech Spec 24-month Local Leak Rate Surveillance Requirements Had Not Been Performed.Caused by Confusion Over 24-month Surveillance Interval
ML19305A846
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/13/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19305A846 (1)
LER 80-011/03L-0:on 800214,during Mode 5 Operation,While Performing Local Leak Rate Test,Five Containment Penetration Leak Rates Exceeded Tech Specs.Caused by Corrosion Buildup on Seating Surface or Valves Needing Adjustment
ML19305A838
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/13/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19305A838 (1)
LER 80-012/03L-0:on 800222,during Mode 5 Operation,While Performing Surveillance Tests on Diesel Generator 1,unit Became Inoperable.Caused by Broken Generator Rotor Shaft in Area of Motor End Bearing Housing.Analyzing Exact Cause
ML19305A835
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/13/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19305A835 (1)
Forwards LERs 80-012/03L-0,80-011/03L-0 & 80-010/03L-0
ML19305A833
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/13/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19305A833 (1)