ML19305A676

From kanterella
Jump to navigation Jump to search
Notifies of New Limit for Pressurizer Spray Valve Operation & Requests Incorporation in Procedure Dp 1101-01 for Facility
ML19305A676
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/16/1977
From: Rogers L
BABCOCK & WILCOX CO.
To: John Miller, Ohanlon J, Toole R
GENERAL PUBLIC UTILITIES CORP., METROPOLITAN EDISON CO.
References
TASK-TF, TASK-TMR REM-I-329, NUDOCS 8001160744
Download: ML19305A676 (2)


Text

.

J O

O h.T

.g. -$~

yJ;f y y j&.k. >.

6

~ ~ '

"l Babcock &Wilcox

%, oe,.,.

o,.c P.,0. Box 1260, Lynchbu,g. Va. 24505

~

Telechone:(804) 384-5111 June 16, 1977

9].d.

.o

.,t-

~

REM-I-329

t
  • l..

SOM-II-Ohl

,i.

i

a. e ~. '

.Mr. G. P. Miller Station Superintendent Metropolitan Edison Company Post Office Box 480 y

Middletown, PA 17057

..W

- I' J.

Mr. J. P. O'Hanlon l

Superintendent, Unit I" l '~ -

~

Metropolitan Edison Company Post Office Box 480 Middletown, PA 17057

. Mr. R. J. Toole Test Superintendent, Unit 2 l

GPU Service Corporation Post Office Box h80

  • ~

~

Middletown, PA 17057

~

Subject:

Pressuriser Spray Valve Operation

  • 3 Gentlenen:

- i The Control Analysis section of Babcock & Wilcox has reviewed the differential temperature between the Pressurizer and the Reactor Coolant System to ensure that the spray actuation would not result in the design criteria being exceeded.

for the Pressurizer Spray and Pressurizer Surge Lines. Based upon this reviev, the current recommendation is:

Do rot aetuate the pressurizer spray valve during plant heatup unless,the(AT;between the pressurizer and the RCS id'less than or. equal to:250 F, unless required for plant safety.

This new limit should be observed for pressurizer spray valve operation and should be incorporated in Section 1.2 of DP 1101-01 for D1I-1.

Revised DP 1101-01 for DiI-2 already ine,1udes this new li=1t.

  • P
  • * =.

w e.* w v.Jun.*%ag..e=

  • =e up p,,,

s.-

s.

s c

~

r

/

i

~

.. Miller /O'Hanlon/Toole 22-6/16/77 '

... ~.,

If you have any further questions, please do not hesitate' to contact me.

., yj-I '

Very truly yours,

. f.'.' {

.s.

d '.

Y.Q f.

i- - ),',

L. C. Rogers.

Manager, Site Services / Site Operations Manager,

LCR/SPM/ bay cc:

J. D. Phinney W. H. Spangler J. L. Seelinger a

J. T. Janis L. R. Plethe 4

R. P. Willianson J. G. Herbein K. R. Ellison D. F. Hallman G. T. Fairburn

.c,.

~

J. A. Lauer B. L. Day E. F. Walde.

P. E. Conner bec:

D. L. Rice

~~'

r t"

s o -.

j t

l l

_