ML19305A462
| ML19305A462 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/17/1979 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | Herbein J METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7906250152 | |
| Download: ML19305A462 (2) | |
Text
~
J e
pnMa u
fl o
UNITED STATES y
'e' g
NUCLEAR REGULATORY COMMISSION h[
3 E
WASMNGTON. D. C. 20655 h; 3 O May 17,1979 i
- v. e j
Docket No. 50-289 Mr. J. G. Herbein Vice President Metropolitan Edison Company P. O. Box 542 Reading, Pennsylvania 19640
Dear Mr. Herbein:
In your letter of April 8,1976, you committed to verifying core flow rate within three months following refueling and every six months f. 30 days thereafter. The purpose of these measurements was to ensure that the core flow rate at 100% power remained above 106.5% of the design flow rate so that the analysis resulting in the power / flow trip and/or overpressure trip setpoints remained conservative. Your letter of September 26, 1978 presented the results of the nine flow measurements which had then been made in response to your connitment. Because each of the measurements indicated a flow which exceeded the criterion value by 3.0 to 4.6% (109.5 to 111.1% of design flow) you proposed to change the frequency of the flow verification tests to once per cycle, within 90 days of resumption of power operation following refueling.
You also requested our approval of this proposed change.
This is to advise you that inasmuch as the flow measurement results you have reported indic;te general consistency over the measurement period and do not exhibit any evidence of a degradation of flow rate, we find that the proposed reduction in frequency of flow verification acceptable.
Sincerely, TY. / 3 /
n,,
hp-f UJw Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors cc: See next page q906250/
.i
,o-t'etropolitan Edison Company i
cc:
G. F. Trowbridge, Esquire Shaw, Pittman, Potts & Trowbridge 1800 ft Street,ti.W.
Washington, D.C.
20036 GP'J Service Corporation Ri;hard W. Heward, Project Manager Mr. E. G. Wallace, Licensing Manager 260 Cherry Hi'.1 Roao Parsippany, riew Jersey 07054
- Pennsylvania Electric Company Mr. R. W. Conrad Vice President, Generation 1001 Broad Street Johnstown, Pennsylvania 15907 fliss flary V. Southard, Chairman Citizens for a Safe Environment
,P. O. Box 405 Harrisburg, Pennsylvania 17108 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, thtyland 20014 Government Publications Section State Library of Pennsylvania Box 1601 (Education Building)
Harrisburg, Pennsylvania 17125 e
. - -