UNITE 3 STATES
f
4
NUCLEAR REGULATORY COMMISslON
}
j
REGION I
.
W
$35 PARK AVENUE
KING OF PRUSSIA PENNSYt.VANIA 19406
Docket No. 50-289
Metropolitan Edison Company
ATTN: Mr. J. G. Herbein
Vice President - Generation
P. O. Box 542
Reading, Pennsylvania
19640
Gentlemen:
Subject:
Inspection 50-289/79-05
This refers to the inspection conducted by Mr. G. Walton of this office
on February 15, 21, 22, and 23,1979 at Three Mile Island Nuclear Station,
Middletown, Pennsylvania of activities authorized by NRC License No.
OPR-50 and to the discussions of our findings held by Mr. Walton with
Mr. Seelinger of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of, the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
'7 9 0 5 0 2 0'1T
.
- - - - -
4
O
Metropolitan Edison Company
2
No reply to this letter is required; however, should you have any ques-
tions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
h
,
c-
Robert T. Carlson, Chief
Reactor Construction and Engineering
,
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-289/79-05
cc w/ enc 1:
E. G. Wallace, Licensing Manager
J. J. Barton, Project Manager
L. L. Lawyer, Manager - Generation Operations
G. P. Miller, Manager - Generating Station - Nuclear
J. L. Seelinger, Unit 1 Superintendent
W. E. Potts, Unit 1 Superintendent - Technical Support
.
I. R. Finfrock, Jr.
Mr. R. Conrad
G. F. Trowbridge, Esquire
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
,