Forwards IE Insp Rept 50-327/78-38 & 50-328/78-27 on 781128-30.No Noncompliance Noted
ML19305A197
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/15/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19305A198 List:
References
NUDOCS 7901220325
Download: ML19305A197 (2)


See also: IR 05000327/1978038

Text

a

UNITED STATES

pa REGoq'o

NUCLEAR REGULATORY COMMISSION

+

'g

bb

87

'

[

REGION 11

o

y,

$*

101 M ARIETTA STRE ET. N.W.

g

{

u

[

ATLANTA, GEORGI A 30303

o

DEC 151978

....,

In Reply Refer To:

RII:CRM

50-327/78-38

50-328/78-27

.

Tennessee Valley Authority

Attn:

Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. C. R. McFarland of this

office on November 28-30, 1978 of activities authorized by NRC License

Nos. CPPR-72 and CPPR-73 for the Sequoyah I and 2 facilities, and to the

discussion of our findings held with Mr. J. E. Wilkins at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously iden.ti-

fied enforcement matters and unresolved items. The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your centractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full s+.tement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Pub)ic Document Room.

7901220 320

.

DEC 151978

.

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

S

f

'

Charles E. Murphy, Chief

Reactor Construction and

'

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-327/78-38

and 50-328/78-27

cc w/ enclosures:

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. G. G. Stack, Project Manager

Sequoyah Nuclear Plant

Post Office Box 2000

Daisy, Tennessee 37319

Mr. J. M. Ballentine

Plant Superintendent

Sequoyah Nuclear Plant

Post Office Box 2000

Daisy, Tennessee 37319

,

Mr. J. F. Cox

i.00 Commerce Street

W9D214

Knoxville, Tennessee 37902