i.
[p* *' %
UNITED STATES
3
,, -
1,
NUCLEAR REGULATORY COMMISSION
,
g
,j
REGION I
e
-
g
431 PARK AVENUE
h,
KING OF PRUSSI A. PENNSYLVANIA 19404
a....
Docket Nos. 50-245
m 2 4 W3
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
1
Subject:
Combined Inspection 50-245/78-36 and 50-336/78-33
This refers to the inspection conducted by Messrs. G. Yuhas and J.
Serabian of this office on November 6-9, 1978, at Millstone Nuclear
Power Station, Units 1 and 2, Waterford, Connecticut, of activities
authorized by NRC License Nos. DPR-21 and DPR-65, and to the discussions
of our findings held by Mr. Yuhas with Mr. E. Mroczka and other members
of your staff at the conclusion of the inspection, and to a subsequent
telephone discussion between Mr. Yuhas and Mr. A. Cheatham on November
14, 1978.
,
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
'
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the item
of noncompliance brought to your attention in a ir;t.or dated February
15, 1978.
We have no further questions regarding sour action at this
time.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
0
790mgo 5~09'
.
-__.
_
_
_
-
__
_
_ _ -
.'
a
Northeast Nuclear Energy Company
2
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
i
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
'
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
No reply to this letter is required; however, should you have any
1
questions concerning this inapection, we will be pleased to discuss them
with you.
'
Sincerely,
/
f
'
G rge H. Smith, Chief
F el Facility and Materials Safety
Branch
Enclosure: Office of Inspection and Enforcement Combined Inspect %
Report Numbers 50-245/78-36 and 50-336/78-33
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)