Forwards IE Insp Repts 50-245/78-36 & 50-336/78-33 on 781106-09.No Noncompliance Noted
ML19305A067
Person / Time
Site: Millstone  
Issue date: 11/24/1978
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19305A068 List:
References
NUDOCS 7901020504
Download: ML19305A067 (2)


See also: IR 05000245/1978036

Text

i.

[p* *' %

UNITED STATES

3

,, -

1,

NUCLEAR REGULATORY COMMISSION

,

g

,j

REGION I

e

-

g

431 PARK AVENUE

h,

KING OF PRUSSI A. PENNSYLVANIA 19404

a....

Docket Nos. 50-245

m 2 4 W3

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

1

Subject:

Combined Inspection 50-245/78-36 and 50-336/78-33

This refers to the inspection conducted by Messrs. G. Yuhas and J.

Serabian of this office on November 6-9, 1978, at Millstone Nuclear

Power Station, Units 1 and 2, Waterford, Connecticut, of activities

authorized by NRC License Nos. DPR-21 and DPR-65, and to the discussions

of our findings held by Mr. Yuhas with Mr. E. Mroczka and other members

of your staff at the conclusion of the inspection, and to a subsequent

telephone discussion between Mr. Yuhas and Mr. A. Cheatham on November

14, 1978.

,

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

'

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the item

of noncompliance brought to your attention in a ir;t.or dated February

15, 1978.

We have no further questions regarding sour action at this

time.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

0

790mgo 5~09'

.

-__.

_

_

_

-

__

_

_ _ -

.'

a

Northeast Nuclear Energy Company

2

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

i

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

'

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any

1

questions concerning this inapection, we will be pleased to discuss them

with you.

'

Sincerely,

/

f

'

G rge H. Smith, Chief

F el Facility and Materials Safety

Branch

Enclosure: Office of Inspection and Enforcement Combined Inspect %

Report Numbers 50-245/78-36 and 50-336/78-33

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

A. Z. Roisman, Natural Resources Defense Council (Without Report)