ML19305A035

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/78-30 & 50-364/78-18 on 781114-17.No Noncompliance Noted
ML19305A035
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/11/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barton A
ALABAMA POWER CO.
Shared Package
ML19305A031 List:
References
NUDOCS 7901020039
Download: ML19305A035 (2)


See also: IR 05000348/1978030

Text

r

9

"

.

p2 uGO

UNITED STATES

NUCLEAR REGULATORY COMMISSION

(

,o,,

o

REGION il

u

O

$

101 M ARIETTA STREET. N.W.

[

ATLANTA, GEORGIA 3o303

o%,.....f

DEC 111978

In Reply Refer To:

RII:WP

50-348/78-30

50-364/78-18

Alabama Power Company

'

ATTN:

Mr. A. R. Barton, Executive Vice President

Post Office Box 2641

Birmingham, Alabama 35291

Gentlemen:

This refers to the inspection conducted by Mr. W. W. Peery of this

office en November 14-17, 1978 of activities authorized by hPC License

Nos. CPPR-86 and NPF-2 for the Farley Nuclear Plant, Units 1 and 2

facilities, and to the discussion of our findings held with Mr. W. G.

Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance werr

disclosed.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report.

This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this repcrt contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

7901020O M

b

[.

DEC11 8

-

.

Alabama. Power Company

-2-

Shoulo you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Y

tbud

s

J. T. Sutherland, Chief

Fuel Facility and Mkterials

Safety Branch

Enclosures:

Inspection Report Nos. 50-346/78-30

and 50-364/78-18

cc w/ enclosures:

Mr. W. G. Hairston, III, Plant Manager

Drawer 470

Ashford, Alabama 36312

Mr. R. E. Hollands, Jr., QA Supervisor

Post Office Box U

Ashford, Alabama 36312

i