ML19302E273
| ML19302E273 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/19/1990 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Northeast Nuclear Energy Co (NNECO) |
| Shared Package | |
| ML19302E274 | List: |
| References | |
| NPF-49-A-055 NUDOCS 9010010300 | |
| Download: ML19302E273 (4) | |
Text
i AB #ic oq%
UNITED STATES NUCLEAR REGULATORY COMMISSION o
{
I wAsHiwoToN, D. C. 20666 NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.
DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 55 License No. NPF-49 1.
The Nuclear Regulatory Comission (the Comission) has found that:
The app (lication for amendment by Northeast Nuclear Energy Company, A.
et al.
the licensee) dated June 29, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Connission; C.
There is reasonable assurance-(1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; a.d E.
The issuance of this amendment is in accordance with'10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
9010010300 900919 gDR ADOCK0500gg3
e
-2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 55
, and the Er.vironmenta! Protection Plan contained in Appendix 8, both of which Jre attached hereto are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION (fg J n. Stolz, Director fjrect Directorate I-4 nvision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 19, 1990
6 4
ATTACHMENT TO LICENSE AMENDMENT NO. 55 FACILTIY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace page 3/4 4-32 of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by amendment number and contains vertical lines inc;icating the areas of change.
)
TACLE 4.4-4 (Continued)
TABLE NOTATIONS
- A radiochemical analysis for E shall consfst of the quantitative measurement of the specific activity for each radionuclide, except for radionuclides with half-lives less than 10 minutes and all radioiodines, which is identified in the reactor coolant.
The specific activities for these individual radionuclides shall be used in the determination of E for the reactor coolant sample.
Determination of the contributors to E shall be based upon those energy peaks identifiable with a 95f. confidence level.
- Sample to be taken after a minimum of 2 EFPD and 20 days of POWER OPERATION have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.
The provisions of Specification 4.0.4 are not applicable.
- Until the specific activity of the Reactor Coolant System is restored within its limits.
' MILLSTONE - UNIT 3 3/4 4-32 AMENDMENT NO. 55