See also: IR 05000313/1990017
Text
.
.
'
'
JUN 2 61990
.
In Reply Refer To:
Dockets:
50-313/90-17
50-368/90-17
Arkansas Nuclear One
ATTN:
Neil S. Carns, Vice
President Nuclear
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. D. L. Garrison of this office
during the period May 29 through June 1, 1990, of activities authorized by HRC
Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,
and to the discussion of our findings with Mr. J. Yelverton and other members
of your staff at the conclusion of the inspection.
The area examined during the inspection was actions taken with regard to
previous inspection findings. This report does not include specific inspection
followup for any Diagnostic Evaluation Team findings (Reference Diagnostic
Evaluation Team Report issued December 21,1989). Within this area, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector. The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
icjentified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Original Signed By:
Samuel J. Collins
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/90-17
50-368/90-17
cc w/ enclosure:
(see next page)
RIV:P.1 :t1QPS*
C:MQPS*
D:DR5*
D:
DLGarrison:nh
IBarnes
LJCallan
SJ
ins
/ /90
/ /90
/ /90
b
90'
- previously concurred
(0i
9007050137 900K6
'g \\
ADOCK 050003,13
Q
.
.
'
.
.
Arkansas Nuclear One
-2-
Entergy Operations, Inc.
ATTN: Donald C. Hintz, Executive
Vice President
P.O. Box 31995
Jackson, Mississippi 39286
Entergy Operations, Inc.
ATTH: Gerald W. Muench, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi
39286
Arkansas Nuclear One
ATTH:
Early Ewing, General Manager
Technical Support and Assessment
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Nuclear One
ATTN: Jerry Yelverton, Director
Nuclear Operations
Route 3, Box 137G
Russellville, Arkansas 72801
Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
Honorable Joe W. Phillips
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
Bishop, Cook, Purcell & Reynolds
ATTN:
Nicholas S. Reynolos, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
ATTH: Ms. Greta Dicus, Director
Division of Environmental Health
Protection
4815 West Markam Street
Little Rock, Arkansas 72201
.
.
.
Arkansas Nucleer One
-3-
Babcock & Wilcox
Nuclear Power Generation Divisica
ATTN: Mr. Robert B. Borsum
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
U.S. Nuclear Regulatory Commission
ATTH: Senior Resident inspector
1 Nuclear Plant Road
Russellville, Arkansas 72801
U.S. Nuclear Regulatory Commission
ATTH: Regional Administrator, Region lY
611 Ryan Plaza Drive. Suite 1000
Arlington, Texas 7601'.
bectoDMB(IE01)
bec distrib. by RIV:
- R. 9. Martin
- Resident inspector
- DRSS-FRPS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV file
- DRP
- MIS System
- RSTS Operator
- Project Engineer (DRP/A)
- DRS
- T. Alexion, NRR Project Manager (MS:
13-E-21)
- C, Poslusny, NRR Project Manager (MS:
13-D-18)
- D. Garrison
- l. Bernes
- w/766