ML19297C883

From kanterella
Jump to navigation Jump to search
Advises That IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment (October 17,1980 Indian Point 3 Event), Was Sent to Listed Licensees on 801121
ML19297C883
Person / Time
Site: Dresden 
Issue date: 11/25/1980
From: Carroll D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19297C884 List:
References
FOIA-81-326 NUDOCS 8101090135
Download: ML19297C883 (6)


Text

L/)D.k

!("y3 y (

'o, UNITED STATES j

NUCLEAR REGULATORY COMMISSION r

REGION lil 1

^

-*g v[/

^"!*

799 ROOssVsLT ROAD o,

atsu suvs. itusois sois7 NOV 2 5 L980 MEMORANDUM FOR: Those on Attached List FROM:

Dorothy E. Carroll, Acting Chief, Word Processing and Document Control Section

SUBJECT:

IE Bulletin No. 80-24 The attached IE Bulletin No. 80-24 titled " Prevention of Damage Due to Water Leakage Inside Containment" (October 17, 1980 Indian Point 2 Event) was sent to the licensees listed below on November 21, 1980:

ACTION American Electric Power Service Corporatica Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)

Commonwealth Edison Company Dresden 1, 2, 3 (50-10, 50-237, 50-249)

Quad-Cities 1, 2 (50-254, 50-265) 3 Zion 1, 2 (50-295, 50-304)

Consumers Power Company Big Rock Point (50-155)

Palisades (50-255)

.- I

_~

Dairyland Power Cooperative g

t:

~

3 LACBWR (50-409) in

-J Iowa Electric Light & Power Company Duane Arnold (50-331)

Northern States Power Company Monticello (50-263)

Prairie Island 1, 2 (50-282, 50-306)

Toledo Edison Company Davis-Besse 1 (50-346)

Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)

Wisconsin Public Service Corporation Kewaunee (50-305)

@]0109L G S Q

Those on Attached List INFORMATION Cincinnati Gas and Electric Company Zimmer (50-358)

Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)

Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)

Byron 1, 2 (50-454, 50-455)

LaSalle 1, 2 (50-373, 50-374)

Consumers Power Company Midland 1, 2 (50-329, 50-330)

Detroit Edison Company Fermi 2 (50-341)

Illinois Power Company Clinton 1, 2 (50-461, 50-462)

Northern Indiana Public Service Company Bailly (50-367)

Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)

Unica Electric Company Callaway 1, 2 (50-483, 50-486) ldl. eJ AfA&

Dorothy E. Carroll, Acting Chief

,'lWord Processing and Document Control Section

Enclosure:

IE Bulletin No. 80-24

SSINS No.-

6820 Accession No.:

8008220270 IEB 80-24 UNITED STATES OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 November 21, 1980 IE Bulletin No. 80-24:

PREVENTION OF DAMAGE DUE TO WATER LEAKAGE INSIDE CONTAINMENT (OCTOBER 17, 1980 INDIAN POINT 2 EVENT)

Descriotion of Circumstances:

On October 24, 1980 IE Information Notice No. 80-37 described an event that occurred at the Indian Point Unit 2 (IP-2) facility.

On October 17, 1980, upon containment entry for repair to a nuclear instrument, it was discovered that several inches of water had accumulated on the containment floor without the operators' kncwledge.

This accumulation was later determined to have amounted to over 100,000 gallons which flooded the reactor vessel pit and wetted the lower nine feet of the reactor vessel while the reactor was at operating temperature.

The flooded condition resulted from the following combination of conditions:

(1) There were significant multiple service water leaks from piping and fan coolers onto the containment floor. This system had a history of leakage; (2) Both containment sump pumps were inoperable, one due to blown fuses and the other due to binding of its float switch; (3) The significance of two containment sump level indicating lights which indicated that the water level was continuously above the pump-down level was not recognized by the operators; (4) There was no high water level alarm and the range of sump level indicating lights failed to indicate the overflowing sump level; (5) The moisture level indicators for the containment atmosphere did not indicate high moisture levels, apparently due to an error in calibration and/or ranging which made them insensitive to the moisture levels resulting from relatively small cold water leaks; (6) The hold-up tanks which ultimately receive water pumped from the containment sump also received water from other sources (Unit 1 process water, lab drain water, etc).

These other water sources masked the effect of cessation of water flows from the Unit 2 sump; (7) The fan cooler condensate wier level measuring instruments were not properly calibrated; (8) There was no water level instrumentation in the reactor vessel pit and the pumps were ineffective since they discharge to the containment floor for ultimate removal by the containment sump pumps.

This Bulletin is issued to enable the NRC staff to formulate requirements for long term generic corrective actions which will be the subject (s) of future NRC actions.

T5e bulletin requires short term actions which will preclude IP-2 type events at cther plants in the interim before the longer term generic actions are accomplished.

IEB 80-24 November 21, 1980 Page 2 of 3 t

Actions to be Taken by Licensees:

1.

Provide a summary description of all open* cooling water systems present inside containment. Your description of the cooling water systems must include:

(a) Mode of operation during routine reactor operation and in response to a LOCA; (b) Source of watei and typical chemical content of water; (c) Materials used in piping and cuolers; (d) Experience with system leakage; (e) History and type of repairs to coolers and piping systems (i.e., replacement, weld, braze, etc.); (f) Provisions for isolating portions of the system inside containment in the event of leakage including vulner-ability of those isolation provisions to single failure; (g) Provisions for testing isolation valves in accordance with Appendix J to 10 CFR 50 (h) Instrumentation (pressure, dew point, flow, radiation detection, etc.)

and procedures in place to detect leakage; and (i) Provisions to detect radioactive contamination in service water discharge from containment.

2.

For plants with open cooling water systems inside containment take the following actions:

Verify existence or provide redundant means of detecting and promptly a.

alerting control room operators of a significant accumulation of water in containment (including the reactor vessel pit if present).

b.

Verify existence or provide positive means for control room operators to determine flow from containment sump (s) used to collect and remove water from containment.

Verify or establish at least monthly surveillance procedures, with c.

appropriate operating limitations, to assure plant operators have at least two methods of determining water level in each location where water may accumulate.

The surveillance procedures shall assure that at least one method to remove water from each such location is available during power operation.

In the event either the detection or removal systems become inoperable it is recommended that continued power operation be limited to seven days and added surveillance measures be instituted.

d. Review leakage detection systems and procedures and provide or verify ability to promptly detect water leakage in containment, and to isolate the leaking components or system.

Periodic containment entry to inspect

  • An Open system utilizes an indefinite volume, such as a river, so that leakage from the system could not be detected by inventory decrease.

In addition, a direct radioactive pathway might exist to outside containment in the event of a LOCA simultaneous with a system leak inside containment. A closed system utilizes a fixed, monitored volume such that leakage from the system could be detected from inventory decrease and a second boundary exists to prevent loss of containment integrity as a result of a system leak inside containment.

IEB 80-24 November 21, 1980 Page 3 of 3 for leakage should be considered.

Beginning within 10 days of the date of this bulletin, whenever the e.

reactor is operating and until the measures described in (a) through (d) above are implemented, conduct interim surveillance measures.

The measures shall include where practical (considering containment atmosphere and ALARA considerations) a periodic containment inspection or remote visual surveillance to check for water leakage.

If containment entry is impractical during operation, perform a containment inspection for water leakage at the first plant shutdown for any reason subsequent to receipt of this bulletin.

f.

Establish procedures to notify the NRC of any service water system leaks within containment sia a special licensee event report (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with written report in 14 days) as a degradation of a containment boundary.

3.

For plants with closed cooling water systems inside containment provide a summary of experiences with cooling water system leakage into containment.

4.

Provide a written report, signed under oath or affirmation, under the provi-sions of Section 182a of the Atomic Energy Act of 1954, in response to the above items within 45 days of the date of this bulletin.

Include in your report where applicable, your schedule for completing the actions in response to items 2 (a) through (d).

Your response should be sent to the Director of the appropriate Regional Office with a copy forwarded to the Director, NRC, Office of Inspection and Enforcement, Washington, D.C.

20555.

If you desire additional information regarding this matter please contact the appropriate IE Regional Office.

Approved by GAO, B180225 (R0072); clearance expires Nosember 30, 1980.

Approval was given under a blanket clearance specifically for identified generic problems.

s

Addressees - Memorandum dated November 24, 1980 J. G. Keppler, Region III C. E. Norelius, Region III R. F. Heishman, Region III G. Fiorelli, Region III Central Files Reproduction Unit NRC 20b Gary N. Wright, Chief Division of Nuclear Safety D. W. Kane, Sargent & Lundy