ML19296E001
| ML19296E001 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/27/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| NUDOCS 8003140032 | |
| Download: ML19296E001 (1) | |
Text
/fC
[pVai v
o, UNITED STATES y } ) =2., ( ',g NUCLEAR REGULATORY COMMISSION 3 ?\\
r REGION IV
%, +' %+# [e[
42 611 RYAN PLAZA DRIVE, SUITE 1000 o,
ARLINGTON TEXAS 76012 February 27, 1980 In Reply Refer To:
RIV Docket Nos.
50-445/IE Information Notice No. 80-06 50-446/IE Information Notice No. 80-06 Texas Utilities Generating Company ATTN:
Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
The enclosed IE Information Notice provides information with regard to an amendment to the Nuclear Regulatory Commission regulations requiring the immediate reporting by telephone of significant events at operating nuclear power plants.
Sincerely,
/
/
^
Karl V. S rit Director
Enclosures:
1.
IE Information Notice No. 80-06 2.
List of Recently Issued IE Information Notices 8003140037
t UNITED STATES SSINS No.:
6870 NUCLEAR RE3UI.ATORY COMMISSION Accession No.-
0FFICE OF INSF3CTION AND ENFORCEMENT 7912190679 WASHINGTON, D.C.
20555 IE Information Notice No. 80-06 Date:
February 27, 1980 Page 1 of 1 NOTIFICATION OF SIGNIFICANT EVENTS Description of Circumstances:
On February 29, 1980, an immediately effective amendment to the Nuclear Regulatory Commission (NRC) regulations is to be published in the Federal Register that sets forth requirements for the reporting of significant events at operating reactors. A copy of the NRC Notice of Rulemaking is enclosed.
The reporting requirement in the new section 50.72, " Notification of significant events," to 10 CFR Part 50 will be effective immediately under the authority of GA0 clearance R0072 (Emergency Generic Clearance -Expires 7/31/80), and is being submitted to the General Accounting Office for review under the Federal Reports Act for permanent approval under NRC's existing GA0 clearance for 10 CFR Part 50
(#R0071).
Paragraph (a) of K50.72 requires, in part, that the licensee notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any significant event listed in the paragraph.
Reports of events pursuant to 130.72 that are similarly required by Technical Specifications to be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are considered to satisify the Technical Specification requirement for prompt telephone notifica-tion.
Technical Specification requirements for confirmatica reports by telegraph, mailgram, or facsimile transmission still apply.
The primary channel for telephone notification of significant events should be through the dedicated telephone line established between the licensee and the NRC Operations Center.
An NRC Duty Officer is available, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, in the NRC Operations Center.
In case the licensee is unable to report a significant event over the dedicated telephone line, the licensee should contact the NRC Operations Center directly by commercial line.
Enclosure:
Notice of Rulemaking DUPLICATE DOCUMENT Entire document previously entered into system under:
[
ANO No. of pages: