ML19296D998
| ML19296D998 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 02/27/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Millen C PUBLIC SERVICE CO. OF COLORADO |
| References | |
| NUDOCS 8003140028 | |
| Download: ML19296D998 (1) | |
Text
bec to DAC:ADM:
,p'""%s CENTRAL FILES y, _
o, UNITED STATES POR:HQ y i ) -1,7^'3 i
NUCLEAR REGULATORY COMMISSICN LPOR
,g:.Md[.
5 REGION IV
=*iTC 8
3, '
E
$11 RYAN PLAZA oRIVE, SUITE 1000 33{g
%, ' N /
,o ARLINGTCN, TEXAS 76012 States February 27, 1980 Docket No. 50-267 Public Serrice Company of Colorado ATTN:
Mr. C. K. Millen Senior Vice President P. O. Box 840 Denver, Colorado 80201 Gentlemen:
The enclosed IE Information Notice provides infor ation with :egard to an amendment to the Nuclear Regulatory Commission regulations requiring the i==ediate reporting by telephone of significant events at operating nuclear power plants.
Sincerely,
/
f//
b l 'i
'l-Karl V. Se frit j
Director
Enclosures:
1.
IE Information Notice No. 80-06 2.
List of Recently Issued IE Information Notices cc:
D. W. Warembourg, Nuclear Production Manager Fort St. Vrain Nuclear Station P. O. Box 368 Platteville, Colorado 80651 L. brey, Manager, Quality Assurance 8003140MS'
UNITED STATES SSINS No.
6870 NUCLEAR REGULATORY COMMISSION Accession No.:
0FFICE OF INSPECTION AND ENFORCEMENT 7912190679 WASHINGTON, D.C.
20555 IE Information Notice No. 80-06 Date:
February 27, 1980 Page 1 of 1 NOTIFICATION OF SIGNIFICANT EVENTS Description of Circumstances:
On February 29, 1980, an immediately effective amendment to the Nuclear Regulatory Commission (NRC) regulations is to be published in the Federal Register that sets forth requirements for the reporting of significant events at operating reactors. A copy of the NRC Notice of Rulemaking is enclosed.
The reporting requirement in the new section 50.72, " Notification of significant events," to 10 CFR Part 50 will be effective immediately under the authority of GA0 clearance R0072 (Emergency Generic Clearance -Expires 7/31/80), and is being submitted to the General Accounting Office for review under the Federal Reports Act for permanent approval under NRC's existing GA0 clearance for 10 CFR Part 50
(#R0071).
Paragraph (a) of K50.72 requires, in part, that the licensee notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any significant event listed in the paragraph.
Reports of events pursuant to K50.72 that are similarly required by Technical Specifications to be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are considered to satisify the Technical Specification requirement for prompt telephone notifica-tion. Technical Specification requirements for confirmation reports by telegraph, mailgram, or facsimile transmission still apply.
The primary channel for telephone notification of significant events should be through the dedicated telephone line established between the licensee and the NRC Operations Center.
An NRC Duty Officer is available, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, in the NRC Operations Center.
In case the licensee is unable to report a significant event over the dedicated telephone line, the licensee should contact the NRC Operations Center directly by commercial line.
Enclosure:
Notice of Rulemaking DUPLICATE DOCUMENT Entire document previously entered into system under:
ANO No. of pages: