ML19296D995

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-06, Notification of Significant Events. No Action Required
ML19296D995
Person / Time
Site: Cooper 
Issue date: 02/27/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8003140022
Download: ML19296D995 (1)


Text

bec to DAC:ADM:

f" *%o.

CENTRAL FILES UNITED STATES y

g NUCLEAR REGULATORY COMMISSION PDR:HQ y 7) e /. 9 :., " y,

LPDR REGION IV gg 3,

f 611 RYAN Pt.AZA oRIVP, SulTE 1000 4

g ARLlNGToN, TEXAS 76012

" ca-February 27, 1980 States Docket No.

50-298 Nebraska Public Power District AlIN:

J. M. Pilanr, Director Licensing & Quality Assurance Post Office Box 499 Columbus, Nebraska 68601 Gentlenen:

The enclosed IE Infornation Notice provides infornation with regard to an anendment to the Nuclear Regulatory Cot:=ission regulations requirin6 the i==ediate reporting by telephone of significant events at operating nuclear power plants.

Sincerely, f

=Y Karl 7. S qfrit A.

[

Director

Enclosures:

1.

IE Infernation Notice No. 80-06 2.

List of Recently Issued IE Infornation Notices cc:

L. C. Lessor, Superintendent Cooper Nuclear Station

?ost Office Box 98 3rownville, Nebraska 68321 s

8003140o w

UNITED STATES SSINS No.

6870 NUCI. EAR REGULATORY COMMISSION Accession No.:

0FFICE OF INSPECTION AND ENFORCEMENT 7912190679 WASHINGTON, D.C.

20555 IE Information Notice No. 80-06 Date:

February 27, 1980 Page 1 of 1 NOTIFICATION OF SIGNIFICANT EVENTS Description of Circumstances:

On February 29, 1980, an immediately effective amendment ta the Nuclear Regulatory Commission (NRC) regulations is to be published in the Federal Register that sets forth requirements for the reporting of significant events at operating reactors. A copy of the NRC Notice of Rulemaking is enclosed.

The reporting requirement in the new section 50.72, " Notification of significant events," to 10 CFR Part 50 will be effective immediately under the authority of GA0 clearance R0072 (Emergency Generic Clearance -Expires 7/31/80), and is being submitted to the General Accounting Office for review under the Federal Reports Act for permanent approval under NRC's existing GA0 clearance for 10 CFR Part 50

(#R0071).

Paragraph (a) of K50.72 requires, in part, that the licensee notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any significant event listed in the paragraph.

Reports of events pursuant to K50.72 that are similarly required by Technical Specifications to be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are considered to satisify the Technical Specification requirement for prompt telephone notifica-tion.

Technical Specification requirements for confirmation reports by telegraph, mailgram, or facsimile transmission still apply.

The primary channel for telephone notification of significant events should be through the dedicated telephone line established between the licensee and the NRC Operations Center. An NRC Duty Officer is available, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, in the NRC Operations Center.

In case the licensee is unable to report a significant event over the dedicated telephone line, the licensee should contact the NRC Operations Center directly by commercial line.

Enclosure:

Notice of Rulemaking DUPLICATE DOCUMENT Entire document previously entered into system under:

xNo W /a / 9 5 /o 7 9 No. of pages:

O