ML19296D726
| ML19296D726 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/30/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Vanderburg D VERMONT YANKEE NUCLEAR POWER CORP. |
| References | |
| IEB-79-01B, IEB-79-1B, NUDOCS 8003130075 | |
| Download: ML19296D726 (2) | |
Text
/ A C.
Y
%,o-UNITED STATES k
NUCLEAR REGULATORY COMMISSION 3
j REGION 1 o
g 631 PARK AVENUE g'S, * ****,e KING CF PRLfSSIA, PE NNSYLVANIA 19406 January 30, 1980 Docket No. 50-271 Vennont Yankee Nuclear Power Corporation ATTN: Mr. D. E. Vanderburg Vice President 25 Research Drive Westborough, Massachusetts 01581 Gentlemen:
This letter confirms the call made to yoce office on January 29, 1980, in which we extended an invitation for members of your staffito attend a meeting at the Region I office to discuss and clarify the requirements in IE Bulletin 79-OlB, Environmental Qualifications of Class IE Equipment, issued on January 14, 1980.
The meeting will be held on February 7,1980, in the Region I conference room starting at 9:00 a.m., and is expected to continue for the duration of the day.
Because of the limited size of our facility, we request that you limit the number of your attendees to two persons.
The requirements of Bulletin 79-018 and the procedures we will implement to determine the adequacy of environmental qualification of safety system components will be discussed in accordance with the proposed agenda enclosed with this letter. Your staff members should be prepared to discuss with my staff any areas of Bulletin 79-01B that require interpretation or clarification.
No reply to this letter is required; however, should you have any questions concerning this meeting, please contact Mr. Alan E. Finkel of this office, (215) 337-5296.
Sincerely,
/
YY-n oyce H. Grier Director
Enclosure:
Proposed Agenda cc w/ encl:
R. L. Smith, Licensing Engineer W. F. Conway, Plant Superintendent Ms. J. Abbey, Technical Secretary Mr. J. E. Griffin, President Mr. R. H. Groce, Licensing Engineer 8 0 0318 00~7 5
..x PROP 05ED AGENDA IE BULLETIN 79-01B FEBRUARY 7. 1980; 9:00 a.m.
I.
INTRODUCTION AND PURPOSE OF MEETING - R. T. Carlson II.
DISCUSSION OF IE BULLETIN 79-018 - A. E. Finkel A.
BACKGROUND B.
ACTIONS TO BE TAKEN (1)
ENCLOSURE 2 (2)
ENCLOSURE 3 (3)
ENCLOSURES 4 AND 5 C.
ACTION COMPLETION SCHEDULE D.
INFORMATION REOUESTED UNDER PROVISIONS OF 10 CFR 50.54(f)
III. DISCUSSION OF SUBSEQUENT ACTIONS BY NRC - A. E. Finkel A.
NUCLEAR FACILITY SITE VISIT (1) EQUIPMENT INSTALLATION INSPECTION (21 DOCUMENTATION REVIEW IV.
QUESTIONS, COMMENTS, AND GENERAL DISCUSSION - Attendees V.
CLOSING COMMENTS - S. D. Ebneter