Forwards IE Info Notice 80-06, Notification of Significant Events. No Action Required
ML19296D652
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/27/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8003120694
Download: ML19296D652 (1)


Text

pa af og

'o UNITED STATES

,.b 8 " >.,, (

j NUCLEAR REGULATORY COMMISSION I

g r

REGION lll o,

f 799 ROOSEVELT ROAD e

GLEN ELLYN. ILLINOIS 60137 827 880 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

The enclosed Information Notice provides information with regard to an amendment to the Nuclear Regulatory Coumission regulations requiring the immediate reporting by telephone of significant events at operating nuclear power plants.

Sincerely, bJ&& ($

James G. Keppler Director

Enclosure:

IE Information Notice No. 80-06 cc w/ encl:

Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammeli ORB /NPS PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations 8003120 b

UNITED STATES SSINS No.

6870 NUCLEAR REGULATORY COMMISSION Accession No.

OFFICE OF INSPECTION AND ENFORCEMENT 7912190679 WASHINGTON, D.C.

20555 February 27, 1980 IE Information Notice No. 80-06 NOTIFICATION OF SIGNIFICANT EVENTS Description of Circumstances:

On February 29, 1910, an immediately effective amendment to the Nuclear Regulatory Commission (NRC) regulations is to be publisned in the Federal Register that sett, forth requirements for the reporting of significant events at operating reactors. A copy of the NRC Notice of Rulemaking is enclosed.

The reporting requirement in the new section 50.72, " Notification of significant events," to 10 CFR Part 50 will be effective immediately under the authority of GA0 clearance R0072 (Emergency Generic Clearance -Expires 7/31/80), and is being submitted to the Caneral Accounting Office for review under the Federal Reports Act for permanent approval under NRC's existing GA0 clearance for 10 CFR Part 50

(#R0071).

Paragraph (a) of g50.72 requires, in part, that the licensee notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of the occurrence of any significant event listed in the paragraph.

Reports of events pursuant to S50.72 that are similarly required by Technical Specifications to be reported by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are considered to satisify the Technical Specification requirement for prompt telephone notifica-tion.

Technical Specification requirements for confirmation reports by telegraph, mailgram, or facsimile transmission still apply.

The primary channel for telephone notification of significant events should be through the dedicated telephone line established between the licensee and the NRC Operations Center.

An NRC Duty Officer is available, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, in the NRC Operations Center.

In case the licensee is unable to report a significant event over the dedicated telephone line, the licensee should contact the NRC Operations Center directly by commercial line.

Enclosure:

Notice of Rulemaking DUPLICATE DOCUMENT Entire document previously entered into system under: