Forwards IE Insp Repts 50-445/79-27 & 50-446/79-26 in Nov 1979
ML19296D234
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/08/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19296D235 List:
References
NUDOCS 8003030051
Download: ML19296D234 (2)


See also: IR 05000445/1979027

Text

/7C

~

UNITED STATES

[pa*E%,%,

NUCLEAR REGULATORY COMMISSION

'

f&

. /'

REGloN IV

'

2 '. i ' ': $

611 RY AN PLAZA DRIVE, SUITE 1000

j

ARLINGTON, TEX AS 76012

7

o,4

$gy , c

%....)./

1

>~

January 8, 1980

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-27

50-446/Rpt. 79-26

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower-

Dallas, Texas

75201

Gentlemen:

This refers to the inspection activities performed by our Resident Inspector,

Mr. R. G. Taylor, for the period of November 1979, of activities authorized

by NRC Construction Permits No. CPPR-126 and 127 for the Comanche Peak

facility, Units No. I and 2, and to the discussion of our findings with

Mr. R. G. Tolson and other members of your staff during the inspection

period.

Areas examined during the inspection and our findings are discussed in the

enclosed inspeccion report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with Appendix B to 10 CFR 50 of the

NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The Notices of Violation for the items of noncompliance reported in the

enclosed inspection report were forwarded to you by our letters dated

November 15 and 21, 1979; therefore, this letter does not require further

response regarding this matter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified

in paragraph 2 of the enclosed report.

gg3030 b

,

Texas Utilities Generating Company

2

January 8, 1980

One new unresolved item is identified in paragraph 7 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

fro.2 public disclosure. The application must include a full statement of the

res;ons why it is claimed that the information is proprietary.

The application

should be prepared so that any proprietary information identified is centained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

h

h-

W. C. Sei le, Chief

Reactor C 'struction and

Engineering Support Branch

Enclosure:

IE Inspection Report No.50-445/79-27

50-446/79-26

cc: w/ enclosure

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201