Forwards IE Insp Rept 50-271/79-22 on 791205-06.No Noncompliance Noted
ML19296C998
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/10/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19296D000 List:
References
NUDOCS 8002290197
Download: ML19296C998 (2)


See also: IR 05000271/1979022

Text

y

.

.

UNITED STATES

p ,,

Do

NUCLEAR REGULATORY COMMisslON

431 PARK AVENUE

  • I

f

KING OF PRUSSIA, PENNSYLVANIA 19406

ya

s y***** /

J!di 10 . a

.

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Robert H. Groce

Licensing Engineer

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

Subject:

Inspection 50-271/79-22

This refers to the inspection conducted by Mr. P. Clemons of this office on

December 5-6, 1979 at Vernon, Vermont, of activities authorized by NRC License

No. OPR-28 and to the discussions of our findings held by Mr. Clemons with Mr.

Murphy and other members of your staff at the conclusion of the inspection, and

to a subsequent telephone discussion between Mr. Clemons and Mr. Leach on

December 10, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

thase areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

acenmoanid 'y an affidavit executed by the owner of the information, which

o

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

C

8002200

1}g

.

.

Vermont Yankee Nuclear Power

2

,1.. ca

'

Corporation

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/ $E

/

George H. Smith, Chier <

v

Fuel Facility and Materig s Safety

Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-271/79-22

cc w/ enc 1:

W. F. Conway, Plant Superintendent

Ms. J. Abbey, Technical Secretary