ML19296C968
| ML19296C968 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/26/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML19296C969 | List: |
| References | |
| NUDOCS 8002290147 | |
| Download: ML19296C968 (2) | |
See also: IR 05000500/1979002
Text
TK)
/pa %q[o,
, '
UNITED STATES
3
'
,n
NUCLEAR REGULATORY COMMISSION
s#
I
$'
- $
REGION 111
o,k " '/
!
799 ROOSEVELT ROAD
,
%,
v
cLEN ELLYN. ILLINOIS 60137
.....
Ai
u 150
Docket No. 50-500
Docket No. 50-501
Toledo Edison Company
ATTN.
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Mr. C. E. Jones of this office
on December 17 and 18, 1979, of the Quality Assurance records for the bed-
rock rock verification program and remedial grouting performed at Davis-
Besse Nuclear Power Station, Units 2 and 3, pursuant to the LWA as amended
on September 13, 1978, and to the discussion of our findings with Mr. Eichenauer
and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
No deviations from commitments which you have made to the Commission were
identified during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the en-
closed inspection report will be placed in the NRC's Public Document Room,
except as follows.
If this report contains information that you or your
contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
8002200 kN
.
U
[3U
Toledo Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
br
.
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-500/79-02
and No. 50-501/79-02
cc w/ enc 1:
Central Files
Reproduction Unit NRC 20b
Local PDR
liarold W. Kohn, Ohio Power
Siting Commission