ML19296C968

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-500/79-02 & 50-501/79-02 on 791217-18.No Noncompliance Noted
ML19296C968
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 01/26/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19296C969 List:
References
NUDOCS 8002290147
Download: ML19296C968 (2)


See also: IR 05000500/1979002

Text

TK)

/pa %q[o,

, '

UNITED STATES

3

'

,n

NUCLEAR REGULATORY COMMISSION

s#

I

$'

- $

REGION 111

o,k " '/

!

799 ROOSEVELT ROAD

,

%,

v

cLEN ELLYN. ILLINOIS 60137

.....

Ai

u 150

Docket No. 50-500

Docket No. 50-501

Toledo Edison Company

ATTN.

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. C. E. Jones of this office

on December 17 and 18, 1979, of the Quality Assurance records for the bed-

rock rock verification program and remedial grouting performed at Davis-

Besse Nuclear Power Station, Units 2 and 3, pursuant to the LWA as amended

on September 13, 1978, and to the discussion of our findings with Mr. Eichenauer

and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

No deviations from commitments which you have made to the Commission were

identified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

8002200 kN

.

U

[3U

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

br

.

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-500/79-02

and No. 50-501/79-02

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

liarold W. Kohn, Ohio Power

Siting Commission