ML19296C747
| ML19296C747 | |
| Person / Time | |
|---|---|
| Site: | 07000754 |
| Issue date: | 09/05/1979 |
| From: | Partlow J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Cunningham G GENERAL ELECTRIC CO. |
| References | |
| NUDOCS 8002280085 | |
| Download: ML19296C747 (2) | |
Text
ADR w s s.r s
U N s T t,
fi, T E S p.
NUCLEAR REGUL 4IORY COMMISSION Y
-l WASH;NGTON D. C. 20555
?+[dh.p~ !
aEP 5 1979 SGML: c l-754 General Electric Company Vallecitos iluclear Center ATTN:
Mr. G. E. Cunningham Sr. Licensing Engineer P. O. Box 460 Pleasanton, California 94566 Gentlemen:
This is in response to your letter of August 17, 1979 in which inventory procecures for Plant 1 were more fully described. We have determined that these auditions to the plan do not decrease the effectiveness of your safeguards program.
Accordingly, the Materials and Plent Protection Amendment MPP-2 to License No. SNM-960 is hereby revised, effective immediately, as shown in the enclosure. License Condition 2.1(a) is revised to incorporate the 70.32(ci change.
We have determined that your submittal of August 17, 1979 contains information of a type specified in 10 CFR 2.790(d). Accordingly, pursuant to Section 2.790(d)(1), such information is deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9.12 sincerel,
ixp n_
Jqmes G.\\ bd M.h irN Partlow, Chief Mqterial Control & Accountability ULicensing Branch Division of Safeguards
Enclosure:
As stated e
~
Enclosare 1 Revision 3 of Sections :.0 through 8.0 in Their Entirety To Materials and Plant Protection Amendment MPP-2 To License No. S T.-960
1.0 ORGAfilZAT10fi
Currently there are no license conditions in this section.
The necessary information has been in-corporated into an approved plan.
2.0 FACILITY OPERATION 2.1 The licensee shall follow the plcns listed below:
(a) Fundamental Nuclear Material Control Plan dated September 1977, and as revised August 17, 1979 for Plant 1, (b) Fundamental fiuclear Material Control and Accounting Plan dated April i5, 1977 and as revised April 14, May 3, and May 12, 1978 for the Fission Product Molybdenum-99 Operation in MBA-34 within Plant 1-,
(c) Safeguards Plan for Plants 2 and 3 dated May 1979; (d) Fundamental Nuclear Materia! Control and Accounting Plan dated August 1976 for Plant 5, as revised August 1977, March 20, April 7, June 16, July 13, and July 24, 1978, and April 27,197b; and as revised in accordance with the provisions of 10 CFR 70.32(c).
2.2 fio statement in the licensee's plan identified in Condition 2.1 shall relieve the licensee of a requirement of 10 CFR 70 unless granted in a specific exemption or exception set forth as a condition of this license.
2.3 Operations involving unreviewed safeguards operations which are not described in the Plan identified in Condition 2.1 shall not be initiated until a Fundamental Nuclear Material Control Plan or applicable revised section thereof has been submitted to and approved by the fiuclear Regulatory Commission.
2.4 All SfiM not in transit shall be physically within an MBA or an ICA.
2.5 The custody of all special nuclear material within each MBA and ICA shall be the responsibility of a single designated individual.
Each MBA shall have a different custodian and no individual shall be the custodian of an MBA and an ICA.
4 4
.